{
  "name": "U.S. Manufacturing Source-Mix Shift Since 2018",
  "version": "3.0.0",
  "description": "For tracked manufacturing families with a reported 2018 baseline and retained China observations in both endpoints, how source-country customs-value shares changed. Each share uses the true annual family total; retained-board coverage is explicit and missing countries are never treated as zero.",
  "url": "https://www.mfgcalcs.com/signals/source-shifts",
  "baseYear": "2018",
  "latestYear": "2025",
  "unit": "percent of the year's import customs value; deltas in percentage points",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "MFG Calcs (mfgcalcs.com), compiled from USITC DataWeb open data",
  "count": 30,
  "unsupportedCount": 27,
  "eligibilityRequirements": [
    {
      "code": "tracked-family-data",
      "description": "The tracked tariff family must have persisted USITC source-country history."
    },
    {
      "code": "exact-2018-baseline-and-later-endpoint",
      "description": "Source-country history must include exact calendar year 2018 and at least one later year."
    },
    {
      "code": "positive-annual-totals",
      "description": "Both endpoints must have a finite, positive annual import customs-value total."
    },
    {
      "code": "usable-endpoint-source-boards",
      "description": "Both endpoint source boards must contain usable nonnegative country values that do not exceed the annual total."
    },
    {
      "code": "named-china-at-both-endpoints",
      "description": "China must be explicitly present at both endpoints; absence from a retained board is unknown, never zero."
    }
  ],
  "unsupportedFamilies": [
    {
      "family": "adhesives-sealants",
      "label": "Adhesives and sealants",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "aluminum-articles",
      "label": "Aluminum articles",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "batteries",
      "label": "Batteries and storage cells",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "compressors-fans",
      "label": "Compressors and fans",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "copper-semis",
      "label": "Copper semi-finished products",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "electric-motors",
      "label": "Electric motors and generators",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "filtering-separation",
      "label": "Filtering and separation equipment",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "glass-fiber",
      "label": "Glass fiber and reinforcements",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "heat-exchange",
      "label": "Heat exchange and process heating",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "industrial-furnaces",
      "label": "Industrial furnaces and ovens",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "iron-steel-articles",
      "label": "Iron and steel castings and articles",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "industrial-lighting",
      "label": "Lamps and LED lighting",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "lifting-handling",
      "label": "Lifting and handling equipment",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "measuring-instruments",
      "label": "Measuring and inspection instruments",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "machine-tools-cutting",
      "label": "Metal-cutting machine tools",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "machine-tools-forming",
      "label": "Metal-forming machine tools",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "nickel-alloys",
      "label": "Nickel and nickel alloys",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "coatings-paints",
      "label": "Paints, coatings, and finishes",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "plastics-rubber-machinery",
      "label": "Plastics and rubber machinery",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "plastics-resins",
      "label": "Plastics in primary forms",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "industrial-robots",
      "label": "Robots and automated machinery",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "semiconductors",
      "label": "Semiconductors and integrated circuits",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "stainless-steel",
      "label": "Stainless steel mill products",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "steel-flat-rolled",
      "label": "Steel flat-rolled products",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "steel-pipe-tube",
      "label": "Steel pipe and tube",
      "status": "no-data",
      "reasonCode": "missing-named-china-observation",
      "reason": "China is not explicitly reported in both the 2018 and 2025 retained source boards, so its missing share cannot be treated as zero.",
      "availableYears": [
        "2014",
        "2015",
        "2016",
        "2017",
        "2018",
        "2019",
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "switchgear-connectors",
      "label": "Switchgear, connectors, and controls",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    },
    {
      "family": "transformers-power",
      "label": "Transformers and power supplies",
      "status": "no-data",
      "reasonCode": "missing-2018-baseline",
      "reason": "Exact calendar year 2018 is not present in this family's source-country history.",
      "availableYears": [
        "2020",
        "2021",
        "2022",
        "2023",
        "2024",
        "2025"
      ]
    }
  ],
  "families": [
    {
      "family": "powered-hand-tools",
      "label": "Powered hand tools",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 62.4
      },
      "topLatest": {
        "country": "China",
        "sharePct": 29.2
      },
      "flipped": false,
      "chinaBasePct": 62.4,
      "chinaLatestPct": 29.2,
      "chinaDeltaPp": -33.2,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 11.1
      },
      "chinaSpark": [
        [
          "2018",
          62.4
        ],
        [
          "2019",
          63.8
        ],
        [
          "2020",
          52.7
        ],
        [
          "2021",
          45.3
        ],
        [
          "2022",
          42.7
        ],
        [
          "2023",
          35.1
        ],
        [
          "2024",
          36.8
        ],
        [
          "2025",
          29.2
        ]
      ],
      "baseBoardValueCoveragePct": 95.8,
      "latestBoardValueCoveragePct": 94.9,
      "endpointBoardsComplete": false
    },
    {
      "family": "hand-tools",
      "label": "Hand tools",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 54.3
      },
      "topLatest": {
        "country": "Taiwan",
        "sharePct": 30
      },
      "flipped": true,
      "chinaBasePct": 54.3,
      "chinaLatestPct": 27.1,
      "chinaDeltaPp": -27.2,
      "gainer": {
        "country": "Taiwan",
        "deltaPp": 8.8
      },
      "chinaSpark": [
        [
          "2018",
          54.3
        ],
        [
          "2019",
          50.2
        ],
        [
          "2020",
          47.8
        ],
        [
          "2021",
          43.5
        ],
        [
          "2022",
          38.3
        ],
        [
          "2023",
          36.5
        ],
        [
          "2024",
          34.9
        ],
        [
          "2025",
          27.1
        ]
      ],
      "baseBoardValueCoveragePct": 93,
      "latestBoardValueCoveragePct": 89.4,
      "endpointBoardsComplete": false
    },
    {
      "family": "steel-structures",
      "label": "Fabricated structural steel",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 31
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 22.1
      },
      "flipped": true,
      "chinaBasePct": 31,
      "chinaLatestPct": 9.4,
      "chinaDeltaPp": -21.6,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 6.1
      },
      "chinaSpark": [
        [
          "2018",
          31
        ],
        [
          "2019",
          17.2
        ],
        [
          "2020",
          14.6
        ],
        [
          "2021",
          14.2
        ],
        [
          "2022",
          13
        ],
        [
          "2023",
          10.6
        ],
        [
          "2024",
          9.7
        ],
        [
          "2025",
          9.4
        ]
      ],
      "baseBoardValueCoveragePct": 87.7,
      "latestBoardValueCoveragePct": 82.3,
      "endpointBoardsComplete": false
    },
    {
      "family": "valves",
      "label": "Valves and fluid controls",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 28.6
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 20.1
      },
      "flipped": true,
      "chinaBasePct": 28.6,
      "chinaLatestPct": 16.7,
      "chinaDeltaPp": -11.9,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 4
      },
      "chinaSpark": [
        [
          "2018",
          28.6
        ],
        [
          "2019",
          24
        ],
        [
          "2020",
          23.5
        ],
        [
          "2021",
          24.3
        ],
        [
          "2022",
          23.8
        ],
        [
          "2023",
          19.7
        ],
        [
          "2024",
          19.8
        ],
        [
          "2025",
          16.7
        ]
      ],
      "baseBoardValueCoveragePct": 85.3,
      "latestBoardValueCoveragePct": 79.9,
      "endpointBoardsComplete": false
    },
    {
      "family": "wire-cable",
      "label": "Insulated wire and cable",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Mexico",
        "sharePct": 52.1
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 49.7
      },
      "flipped": false,
      "chinaBasePct": 21.8,
      "chinaLatestPct": 10,
      "chinaDeltaPp": -11.8,
      "gainer": {
        "country": "Vietnam",
        "deltaPp": 4.3
      },
      "chinaSpark": [
        [
          "2018",
          21.8
        ],
        [
          "2019",
          16.1
        ],
        [
          "2020",
          15.7
        ],
        [
          "2021",
          13.8
        ],
        [
          "2022",
          13.4
        ],
        [
          "2023",
          10.6
        ],
        [
          "2024",
          11.1
        ],
        [
          "2025",
          10
        ]
      ],
      "baseBoardValueCoveragePct": 91.3,
      "latestBoardValueCoveragePct": 84.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "passive-components",
      "label": "Capacitors, resistors, and circuit boards",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 30.2
      },
      "topLatest": {
        "country": "Taiwan",
        "sharePct": 19.3
      },
      "flipped": true,
      "chinaBasePct": 30.2,
      "chinaLatestPct": 18.5,
      "chinaDeltaPp": -11.7,
      "gainer": {
        "country": "Taiwan",
        "deltaPp": 8.6
      },
      "chinaSpark": [
        [
          "2018",
          30.2
        ],
        [
          "2019",
          23.6
        ],
        [
          "2020",
          22.6
        ],
        [
          "2021",
          22.3
        ],
        [
          "2022",
          20.8
        ],
        [
          "2023",
          19.5
        ],
        [
          "2024",
          19.5
        ],
        [
          "2025",
          18.5
        ]
      ],
      "baseBoardValueCoveragePct": 84,
      "latestBoardValueCoveragePct": 82.9,
      "endpointBoardsComplete": false
    },
    {
      "family": "carbon-insulators",
      "label": "Carbon products and insulators",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 33.6
      },
      "topLatest": {
        "country": "China",
        "sharePct": 22
      },
      "flipped": false,
      "chinaBasePct": 33.6,
      "chinaLatestPct": 22,
      "chinaDeltaPp": -11.6,
      "gainer": {
        "country": "Canada",
        "deltaPp": 3.4
      },
      "chinaSpark": [
        [
          "2018",
          33.6
        ],
        [
          "2019",
          18.2
        ],
        [
          "2020",
          21.6
        ],
        [
          "2021",
          19.9
        ],
        [
          "2022",
          21.5
        ],
        [
          "2023",
          21.6
        ],
        [
          "2024",
          23.6
        ],
        [
          "2025",
          22
        ]
      ],
      "baseBoardValueCoveragePct": 89.9,
      "latestBoardValueCoveragePct": 83.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "cutting-tools",
      "label": "Cutting tools and inserts",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 23.3
      },
      "topLatest": {
        "country": "Germany",
        "sharePct": 17
      },
      "flipped": true,
      "chinaBasePct": 23.3,
      "chinaLatestPct": 11.8,
      "chinaDeltaPp": -11.5,
      "gainer": {
        "country": "Germany",
        "deltaPp": 1.7
      },
      "chinaSpark": [
        [
          "2018",
          23.3
        ],
        [
          "2019",
          19.1
        ],
        [
          "2020",
          20.4
        ],
        [
          "2021",
          17.5
        ],
        [
          "2022",
          17.3
        ],
        [
          "2023",
          13.6
        ],
        [
          "2024",
          13.6
        ],
        [
          "2025",
          11.8
        ]
      ],
      "baseBoardValueCoveragePct": 86.1,
      "latestBoardValueCoveragePct": 76.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "tanks-vessels",
      "label": "Tanks, vessels, and gas cylinders",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 24.8
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 20
      },
      "flipped": true,
      "chinaBasePct": 24.8,
      "chinaLatestPct": 13.5,
      "chinaDeltaPp": -11.3,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 5.1
      },
      "chinaSpark": [
        [
          "2018",
          24.8
        ],
        [
          "2019",
          19.1
        ],
        [
          "2020",
          21.7
        ],
        [
          "2021",
          19.1
        ],
        [
          "2022",
          17.2
        ],
        [
          "2023",
          14.1
        ],
        [
          "2024",
          13.7
        ],
        [
          "2025",
          13.5
        ]
      ],
      "baseBoardValueCoveragePct": 87.9,
      "latestBoardValueCoveragePct": 83.8,
      "endpointBoardsComplete": false
    },
    {
      "family": "steel-fasteners",
      "label": "Steel fasteners",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Taiwan",
        "sharePct": 32.5
      },
      "topLatest": {
        "country": "Taiwan",
        "sharePct": 32
      },
      "flipped": false,
      "chinaBasePct": 26.8,
      "chinaLatestPct": 17.2,
      "chinaDeltaPp": -9.6,
      "gainer": {
        "country": "India",
        "deltaPp": 2.4
      },
      "chinaSpark": [
        [
          "2018",
          26.8
        ],
        [
          "2019",
          20.2
        ],
        [
          "2020",
          17.4
        ],
        [
          "2021",
          18.5
        ],
        [
          "2022",
          20.8
        ],
        [
          "2023",
          17.2
        ],
        [
          "2024",
          18.1
        ],
        [
          "2025",
          17.2
        ]
      ],
      "baseBoardValueCoveragePct": 92.2,
      "latestBoardValueCoveragePct": 88,
      "endpointBoardsComplete": false
    },
    {
      "family": "bearings",
      "label": "Bearings",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 23.4
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 21.5
      },
      "flipped": false,
      "chinaBasePct": 19.7,
      "chinaLatestPct": 11.7,
      "chinaDeltaPp": -8,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 2.3
      },
      "chinaSpark": [
        [
          "2018",
          19.7
        ],
        [
          "2019",
          18
        ],
        [
          "2020",
          19
        ],
        [
          "2021",
          19
        ],
        [
          "2022",
          17.6
        ],
        [
          "2023",
          14.8
        ],
        [
          "2024",
          14.1
        ],
        [
          "2025",
          11.7
        ]
      ],
      "baseBoardValueCoveragePct": 85.2,
      "latestBoardValueCoveragePct": 84.1,
      "endpointBoardsComplete": false
    },
    {
      "family": "optical-components",
      "label": "Optical elements and lenses",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 18.8
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 16.7
      },
      "flipped": false,
      "chinaBasePct": 16.5,
      "chinaLatestPct": 8.5,
      "chinaDeltaPp": -8,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 6.3
      },
      "chinaSpark": [
        [
          "2018",
          16.5
        ],
        [
          "2019",
          14.7
        ],
        [
          "2020",
          13
        ],
        [
          "2021",
          12.6
        ],
        [
          "2022",
          10.9
        ],
        [
          "2023",
          11.1
        ],
        [
          "2024",
          10.2
        ],
        [
          "2025",
          8.5
        ]
      ],
      "baseBoardValueCoveragePct": 82.3,
      "latestBoardValueCoveragePct": 77.3,
      "endpointBoardsComplete": false
    },
    {
      "family": "plastic-semis",
      "label": "Plastic semi-finished products",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Canada",
        "sharePct": 24.7
      },
      "topLatest": {
        "country": "Canada",
        "sharePct": 22.9
      },
      "flipped": false,
      "chinaBasePct": 15.4,
      "chinaLatestPct": 7.5,
      "chinaDeltaPp": -7.9,
      "gainer": {
        "country": "South Korea",
        "deltaPp": 1.7
      },
      "chinaSpark": [
        [
          "2018",
          15.4
        ],
        [
          "2019",
          10.4
        ],
        [
          "2020",
          10.3
        ],
        [
          "2021",
          9.9
        ],
        [
          "2022",
          9
        ],
        [
          "2023",
          8.7
        ],
        [
          "2024",
          8.9
        ],
        [
          "2025",
          7.5
        ]
      ],
      "baseBoardValueCoveragePct": 80.9,
      "latestBoardValueCoveragePct": 73.6,
      "endpointBoardsComplete": false
    },
    {
      "family": "aluminum-semis",
      "label": "Aluminum semi-finished products",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Canada",
        "sharePct": 22.1
      },
      "topLatest": {
        "country": "Canada",
        "sharePct": 20.1
      },
      "flipped": false,
      "chinaBasePct": 14,
      "chinaLatestPct": 6.4,
      "chinaDeltaPp": -7.6,
      "gainer": {
        "country": "Oman",
        "deltaPp": 0.4
      },
      "chinaSpark": [
        [
          "2018",
          14
        ],
        [
          "2019",
          9.1
        ],
        [
          "2020",
          10.1
        ],
        [
          "2021",
          10.3
        ],
        [
          "2022",
          11.3
        ],
        [
          "2023",
          9.6
        ],
        [
          "2024",
          10
        ],
        [
          "2025",
          6.4
        ]
      ],
      "baseBoardValueCoveragePct": 66.5,
      "latestBoardValueCoveragePct": 65.1,
      "endpointBoardsComplete": false
    },
    {
      "family": "power-transmission",
      "label": "Gears and power transmission",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 19.2
      },
      "topLatest": {
        "country": "Germany",
        "sharePct": 12.5
      },
      "flipped": true,
      "chinaBasePct": 19.2,
      "chinaLatestPct": 11.6,
      "chinaDeltaPp": -7.6,
      "gainer": {
        "country": "India",
        "deltaPp": 6.2
      },
      "chinaSpark": [
        [
          "2018",
          19.2
        ],
        [
          "2019",
          19.6
        ],
        [
          "2020",
          18.1
        ],
        [
          "2021",
          18.3
        ],
        [
          "2022",
          17.3
        ],
        [
          "2023",
          13.6
        ],
        [
          "2024",
          12.6
        ],
        [
          "2025",
          11.6
        ]
      ],
      "baseBoardValueCoveragePct": 83.7,
      "latestBoardValueCoveragePct": 82.6,
      "endpointBoardsComplete": false
    },
    {
      "family": "pumps",
      "label": "Pumps for liquids",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 20.3
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 21.4
      },
      "flipped": true,
      "chinaBasePct": 20.3,
      "chinaLatestPct": 13.3,
      "chinaDeltaPp": -7,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 2.3
      },
      "chinaSpark": [
        [
          "2018",
          20.3
        ],
        [
          "2019",
          18.5
        ],
        [
          "2020",
          19.3
        ],
        [
          "2021",
          17
        ],
        [
          "2022",
          17.4
        ],
        [
          "2023",
          15.9
        ],
        [
          "2024",
          15.4
        ],
        [
          "2025",
          13.3
        ]
      ],
      "baseBoardValueCoveragePct": 83.5,
      "latestBoardValueCoveragePct": 81.1,
      "endpointBoardsComplete": false
    },
    {
      "family": "steel-springs-chain",
      "label": "Springs, chain, and wire mesh",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Mexico",
        "sharePct": 35.6
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 35.3
      },
      "flipped": false,
      "chinaBasePct": 24.3,
      "chinaLatestPct": 17.5,
      "chinaDeltaPp": -6.8,
      "gainer": {
        "country": "Japan",
        "deltaPp": 0.6
      },
      "chinaSpark": [
        [
          "2018",
          24.3
        ],
        [
          "2019",
          19.7
        ],
        [
          "2020",
          21.6
        ],
        [
          "2021",
          20.9
        ],
        [
          "2022",
          22.4
        ],
        [
          "2023",
          19.3
        ],
        [
          "2024",
          18.1
        ],
        [
          "2025",
          17.5
        ]
      ],
      "baseBoardValueCoveragePct": 92.1,
      "latestBoardValueCoveragePct": 87.4,
      "endpointBoardsComplete": false
    },
    {
      "family": "molds-dies",
      "label": "Molds and die sets",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Canada",
        "sharePct": 40.7
      },
      "topLatest": {
        "country": "Canada",
        "sharePct": 37.2
      },
      "flipped": false,
      "chinaBasePct": 22,
      "chinaLatestPct": 15.3,
      "chinaDeltaPp": -6.7,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 1.8
      },
      "chinaSpark": [
        [
          "2018",
          22
        ],
        [
          "2019",
          21.4
        ],
        [
          "2020",
          18.6
        ],
        [
          "2021",
          18.2
        ],
        [
          "2022",
          16.7
        ],
        [
          "2023",
          16.1
        ],
        [
          "2024",
          15.6
        ],
        [
          "2025",
          15.3
        ]
      ],
      "baseBoardValueCoveragePct": 91.4,
      "latestBoardValueCoveragePct": 85.8,
      "endpointBoardsComplete": false
    },
    {
      "family": "specialty-metals",
      "label": "Titanium and tungsten",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 24.6
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 28.9
      },
      "flipped": false,
      "chinaBasePct": 15.5,
      "chinaLatestPct": 9.6,
      "chinaDeltaPp": -5.9,
      "gainer": {
        "country": "Japan",
        "deltaPp": 4.3
      },
      "chinaSpark": [
        [
          "2018",
          15.5
        ],
        [
          "2019",
          14.1
        ],
        [
          "2020",
          15.8
        ],
        [
          "2021",
          15.5
        ],
        [
          "2022",
          15.3
        ],
        [
          "2023",
          11.5
        ],
        [
          "2024",
          12.4
        ],
        [
          "2025",
          9.6
        ]
      ],
      "baseBoardValueCoveragePct": 89.6,
      "latestBoardValueCoveragePct": 82.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "abrasives",
      "label": "Abrasives and grinding wheels",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "China",
        "sharePct": 15.2
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 13.6
      },
      "flipped": true,
      "chinaBasePct": 15.2,
      "chinaLatestPct": 9.7,
      "chinaDeltaPp": -5.5,
      "gainer": {
        "country": "South Korea",
        "deltaPp": 2.2
      },
      "chinaSpark": [
        [
          "2018",
          15.2
        ],
        [
          "2019",
          11.5
        ],
        [
          "2020",
          12.5
        ],
        [
          "2021",
          12.3
        ],
        [
          "2022",
          11.9
        ],
        [
          "2023",
          9.7
        ],
        [
          "2024",
          10.1
        ],
        [
          "2025",
          9.7
        ]
      ],
      "baseBoardValueCoveragePct": 81.4,
      "latestBoardValueCoveragePct": 76.6,
      "endpointBoardsComplete": false
    },
    {
      "family": "rubber-products",
      "label": "Rubber materials and products",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Mexico",
        "sharePct": 19.8
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 25.6
      },
      "flipped": false,
      "chinaBasePct": 15.7,
      "chinaLatestPct": 10.3,
      "chinaDeltaPp": -5.4,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 5.8
      },
      "chinaSpark": [
        [
          "2018",
          15.7
        ],
        [
          "2019",
          13.5
        ],
        [
          "2020",
          14
        ],
        [
          "2021",
          14.4
        ],
        [
          "2022",
          13.6
        ],
        [
          "2023",
          12.4
        ],
        [
          "2024",
          12.2
        ],
        [
          "2025",
          10.3
        ]
      ],
      "baseBoardValueCoveragePct": 80.7,
      "latestBoardValueCoveragePct": 80,
      "endpointBoardsComplete": false
    },
    {
      "family": "gaskets-seals",
      "label": "Gaskets and mechanical seals",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Mexico",
        "sharePct": 18.5
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 22.3
      },
      "flipped": false,
      "chinaBasePct": 10.9,
      "chinaLatestPct": 6.1,
      "chinaDeltaPp": -4.8,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 3.8
      },
      "chinaSpark": [
        [
          "2018",
          10.9
        ],
        [
          "2019",
          8.7
        ],
        [
          "2020",
          7.3
        ],
        [
          "2021",
          8
        ],
        [
          "2022",
          8.8
        ],
        [
          "2023",
          7.2
        ],
        [
          "2024",
          7.2
        ],
        [
          "2025",
          6.1
        ]
      ],
      "baseBoardValueCoveragePct": 84.3,
      "latestBoardValueCoveragePct": 81.3,
      "endpointBoardsComplete": false
    },
    {
      "family": "packaging-machinery",
      "label": "Packaging and filling machinery",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Germany",
        "sharePct": 24.6
      },
      "topLatest": {
        "country": "Germany",
        "sharePct": 24.7
      },
      "flipped": false,
      "chinaBasePct": 10,
      "chinaLatestPct": 5.7,
      "chinaDeltaPp": -4.3,
      "gainer": {
        "country": "Switzerland",
        "deltaPp": 1.9
      },
      "chinaSpark": [
        [
          "2018",
          10
        ],
        [
          "2019",
          8.7
        ],
        [
          "2020",
          9.8
        ],
        [
          "2021",
          9.6
        ],
        [
          "2022",
          9
        ],
        [
          "2023",
          7.4
        ],
        [
          "2024",
          7.3
        ],
        [
          "2025",
          5.7
        ]
      ],
      "baseBoardValueCoveragePct": 86.6,
      "latestBoardValueCoveragePct": 83.4,
      "endpointBoardsComplete": false
    },
    {
      "family": "semiconductor-equipment",
      "label": "Semiconductor and display equipment",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 33.4
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 24.4
      },
      "flipped": false,
      "chinaBasePct": 10.1,
      "chinaLatestPct": 6.9,
      "chinaDeltaPp": -3.2,
      "gainer": {
        "country": "Malaysia",
        "deltaPp": 5.7
      },
      "chinaSpark": [
        [
          "2018",
          10.1
        ],
        [
          "2019",
          4.4
        ],
        [
          "2020",
          7.1
        ],
        [
          "2021",
          7.8
        ],
        [
          "2022",
          6.3
        ],
        [
          "2023",
          5.6
        ],
        [
          "2024",
          6.7
        ],
        [
          "2025",
          6.9
        ]
      ],
      "baseBoardValueCoveragePct": 95,
      "latestBoardValueCoveragePct": 93,
      "endpointBoardsComplete": false
    },
    {
      "family": "turbines",
      "label": "Turbines and fluid-power drives",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "France",
        "sharePct": 19.3
      },
      "topLatest": {
        "country": "Canada",
        "sharePct": 18.4
      },
      "flipped": true,
      "chinaBasePct": 5.8,
      "chinaLatestPct": 3.1,
      "chinaDeltaPp": -2.7,
      "gainer": {
        "country": "Canada",
        "deltaPp": 4.7
      },
      "chinaSpark": [
        [
          "2018",
          5.8
        ],
        [
          "2019",
          4.2
        ],
        [
          "2020",
          5.3
        ],
        [
          "2021",
          4.4
        ],
        [
          "2022",
          3.6
        ],
        [
          "2023",
          3
        ],
        [
          "2024",
          3.1
        ],
        [
          "2025",
          3.1
        ]
      ],
      "baseBoardValueCoveragePct": 84.1,
      "latestBoardValueCoveragePct": 82.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "engines",
      "label": "Internal combustion engines",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Mexico",
        "sharePct": 31.7
      },
      "topLatest": {
        "country": "Mexico",
        "sharePct": 35.9
      },
      "flipped": false,
      "chinaBasePct": 7.7,
      "chinaLatestPct": 5.4,
      "chinaDeltaPp": -2.3,
      "gainer": {
        "country": "Mexico",
        "deltaPp": 4.2
      },
      "chinaSpark": [
        [
          "2018",
          7.7
        ],
        [
          "2019",
          6
        ],
        [
          "2020",
          6.6
        ],
        [
          "2021",
          6.9
        ],
        [
          "2022",
          7.3
        ],
        [
          "2023",
          5.7
        ],
        [
          "2024",
          5.7
        ],
        [
          "2025",
          5.4
        ]
      ],
      "baseBoardValueCoveragePct": 93,
      "latestBoardValueCoveragePct": 90.9,
      "endpointBoardsComplete": false
    },
    {
      "family": "steel-long-products",
      "label": "Steel bar, rod, and wire",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Canada",
        "sharePct": 22.4
      },
      "topLatest": {
        "country": "Canada",
        "sharePct": 19.8
      },
      "flipped": false,
      "chinaBasePct": 5.2,
      "chinaLatestPct": 2.9,
      "chinaDeltaPp": -2.3,
      "gainer": {
        "country": "South Korea",
        "deltaPp": 2.2
      },
      "chinaSpark": [
        [
          "2018",
          5.2
        ],
        [
          "2019",
          4.5
        ],
        [
          "2020",
          3.6
        ],
        [
          "2021",
          2.8
        ],
        [
          "2022",
          2.7
        ],
        [
          "2023",
          3.8
        ],
        [
          "2024",
          3.3
        ],
        [
          "2025",
          2.9
        ]
      ],
      "baseBoardValueCoveragePct": 79,
      "latestBoardValueCoveragePct": 77.1,
      "endpointBoardsComplete": false
    },
    {
      "family": "foundry-metallurgy",
      "label": "Foundry and rolling equipment",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Germany",
        "sharePct": 21.8
      },
      "topLatest": {
        "country": "Italy",
        "sharePct": 16.7
      },
      "flipped": true,
      "chinaBasePct": 10.6,
      "chinaLatestPct": 8.9,
      "chinaDeltaPp": -1.7,
      "gainer": {
        "country": "Italy",
        "deltaPp": 4.1
      },
      "chinaSpark": [
        [
          "2018",
          10.6
        ],
        [
          "2019",
          8.5
        ],
        [
          "2020",
          6.6
        ],
        [
          "2021",
          9.5
        ],
        [
          "2022",
          10.9
        ],
        [
          "2023",
          11.5
        ],
        [
          "2024",
          8.2
        ],
        [
          "2025",
          8.9
        ]
      ],
      "baseBoardValueCoveragePct": 87.4,
      "latestBoardValueCoveragePct": 82.2,
      "endpointBoardsComplete": false
    },
    {
      "family": "technical-ceramics",
      "label": "Technical and refractory ceramics",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 33.2
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 31.6
      },
      "flipped": false,
      "chinaBasePct": 9.1,
      "chinaLatestPct": 7.6,
      "chinaDeltaPp": -1.5,
      "gainer": {
        "country": "Poland",
        "deltaPp": 1.3
      },
      "chinaSpark": [
        [
          "2018",
          9.1
        ],
        [
          "2019",
          8.4
        ],
        [
          "2020",
          9.2
        ],
        [
          "2021",
          9.6
        ],
        [
          "2022",
          8.7
        ],
        [
          "2023",
          8.1
        ],
        [
          "2024",
          8.4
        ],
        [
          "2025",
          7.6
        ]
      ],
      "baseBoardValueCoveragePct": 91.7,
      "latestBoardValueCoveragePct": 89,
      "endpointBoardsComplete": false
    },
    {
      "family": "welding-equipment",
      "label": "Welding equipment",
      "baseYear": "2018",
      "latestYear": "2025",
      "topBase": {
        "country": "Japan",
        "sharePct": 24.4
      },
      "topLatest": {
        "country": "Japan",
        "sharePct": 18.1
      },
      "flipped": false,
      "chinaBasePct": 9.2,
      "chinaLatestPct": 8.9,
      "chinaDeltaPp": -0.3,
      "gainer": {
        "country": "South Korea",
        "deltaPp": 4.9
      },
      "chinaSpark": [
        [
          "2018",
          9.2
        ],
        [
          "2019",
          8.1
        ],
        [
          "2020",
          8.6
        ],
        [
          "2021",
          10.3
        ],
        [
          "2022",
          10
        ],
        [
          "2023",
          8.3
        ],
        [
          "2024",
          9.6
        ],
        [
          "2025",
          8.9
        ]
      ],
      "baseBoardValueCoveragePct": 90.6,
      "latestBoardValueCoveragePct": 87.3,
      "endpointBoardsComplete": false
    }
  ]
}
