{
  "version": "1.0.0",
  "asOf": "2026-06",
  "stateCount": 51,
  "national": 100,
  "weights": {
    "labor": 0.75,
    "energy": 0.25
  },
  "cheapest": [
    {
      "code": "NM",
      "name": "New Mexico",
      "index": 88.3,
      "labor": 101,
      "energy": 50.4,
      "band": "low-cost",
      "url": "/economy/states/new-mexico"
    },
    {
      "code": "TN",
      "name": "Tennessee",
      "index": 88.3,
      "labor": 92.7,
      "energy": 74.9,
      "band": "low-cost",
      "url": "/economy/states/tennessee"
    },
    {
      "code": "AR",
      "name": "Arkansas",
      "index": 88.7,
      "labor": 92.6,
      "energy": 77.2,
      "band": "low-cost",
      "url": "/economy/states/arkansas"
    },
    {
      "code": "WV",
      "name": "West Virginia",
      "index": 90.3,
      "labor": 91.5,
      "energy": 86.7,
      "band": "low-cost",
      "url": "/economy/states/west-virginia"
    },
    {
      "code": "MS",
      "name": "Mississippi",
      "index": 90.4,
      "labor": 90.4,
      "energy": 90.4,
      "band": "low-cost",
      "url": "/economy/states/mississippi"
    }
  ],
  "priciest": [
    {
      "code": "HI",
      "name": "Hawaii",
      "index": 213.3,
      "labor": 126.7,
      "energy": 473,
      "band": "high-cost",
      "url": "/economy/states/hawaii"
    },
    {
      "code": "AK",
      "name": "Alaska",
      "index": 153.6,
      "labor": 128.4,
      "energy": 229.2,
      "band": "high-cost",
      "url": "/economy/states/alaska"
    },
    {
      "code": "RI",
      "name": "Rhode Island",
      "index": 139.1,
      "labor": 102.2,
      "energy": 249.8,
      "band": "high-cost",
      "url": "/economy/states/rhode-island"
    },
    {
      "code": "CA",
      "name": "California",
      "index": 138.6,
      "labor": 109.4,
      "energy": 226.2,
      "band": "high-cost",
      "url": "/economy/states/california"
    },
    {
      "code": "DC",
      "name": "District of Columbia",
      "index": 136.3,
      "labor": 122.8,
      "energy": 176.8,
      "band": "high-cost",
      "url": "/economy/states/district-of-columbia"
    }
  ],
  "rows": [
    {
      "code": "NM",
      "name": "New Mexico",
      "index": 88.3,
      "labor": 101,
      "energy": 50.4,
      "band": "low-cost",
      "url": "/economy/states/new-mexico"
    },
    {
      "code": "TN",
      "name": "Tennessee",
      "index": 88.3,
      "labor": 92.7,
      "energy": 74.9,
      "band": "low-cost",
      "url": "/economy/states/tennessee"
    },
    {
      "code": "AR",
      "name": "Arkansas",
      "index": 88.7,
      "labor": 92.6,
      "energy": 77.2,
      "band": "low-cost",
      "url": "/economy/states/arkansas"
    },
    {
      "code": "WV",
      "name": "West Virginia",
      "index": 90.3,
      "labor": 91.5,
      "energy": 86.7,
      "band": "low-cost",
      "url": "/economy/states/west-virginia"
    },
    {
      "code": "MS",
      "name": "Mississippi",
      "index": 90.4,
      "labor": 90.4,
      "energy": 90.4,
      "band": "low-cost",
      "url": "/economy/states/mississippi"
    },
    {
      "code": "TX",
      "name": "Texas",
      "index": 90.5,
      "labor": 96.7,
      "energy": 71.8,
      "band": "low-cost",
      "url": "/economy/states/texas"
    },
    {
      "code": "OK",
      "name": "Oklahoma",
      "index": 92.3,
      "labor": 96.2,
      "energy": 80.4,
      "band": "low-cost",
      "url": "/economy/states/oklahoma"
    },
    {
      "code": "AL",
      "name": "Alabama",
      "index": 92.8,
      "labor": 95,
      "energy": 86.4,
      "band": "low-cost",
      "url": "/economy/states/alabama"
    },
    {
      "code": "KY",
      "name": "Kentucky",
      "index": 93.1,
      "labor": 98.1,
      "energy": 78,
      "band": "low-cost",
      "url": "/economy/states/kentucky"
    },
    {
      "code": "NC",
      "name": "North Carolina",
      "index": 93.2,
      "labor": 95.7,
      "energy": 85.8,
      "band": "low-cost",
      "url": "/economy/states/north-carolina"
    },
    {
      "code": "LA",
      "name": "Louisiana",
      "index": 93.8,
      "labor": 100.8,
      "energy": 73,
      "band": "low-cost",
      "url": "/economy/states/louisiana"
    },
    {
      "code": "SC",
      "name": "South Carolina",
      "index": 94.8,
      "labor": 99,
      "energy": 82.3,
      "band": "low-cost",
      "url": "/economy/states/south-carolina"
    },
    {
      "code": "GA",
      "name": "Georgia",
      "index": 95,
      "labor": 94.5,
      "energy": 96.6,
      "band": "mid-cost",
      "url": "/economy/states/georgia"
    },
    {
      "code": "MT",
      "name": "Montana",
      "index": 95.1,
      "labor": 102.5,
      "energy": 72.8,
      "band": "mid-cost",
      "url": "/economy/states/montana"
    },
    {
      "code": "FL",
      "name": "Florida",
      "index": 96.1,
      "labor": 95,
      "energy": 99.5,
      "band": "mid-cost",
      "url": "/economy/states/florida"
    },
    {
      "code": "SD",
      "name": "South Dakota",
      "index": 96.2,
      "labor": 93.9,
      "energy": 102.9,
      "band": "mid-cost",
      "url": "/economy/states/south-dakota"
    },
    {
      "code": "MI",
      "name": "Michigan",
      "index": 96.6,
      "labor": 95.2,
      "energy": 100.8,
      "band": "mid-cost",
      "url": "/economy/states/michigan"
    },
    {
      "code": "IA",
      "name": "Iowa",
      "index": 97.8,
      "labor": 99.5,
      "energy": 92.5,
      "band": "mid-cost",
      "url": "/economy/states/iowa"
    },
    {
      "code": "IN",
      "name": "Indiana",
      "index": 98.2,
      "labor": 98.2,
      "energy": 98.1,
      "band": "mid-cost",
      "url": "/economy/states/indiana"
    },
    {
      "code": "KS",
      "name": "Kansas",
      "index": 98.3,
      "labor": 101.3,
      "energy": 89.5,
      "band": "mid-cost",
      "url": "/economy/states/kansas"
    },
    {
      "code": "AZ",
      "name": "Arizona",
      "index": 98.5,
      "labor": 103.2,
      "energy": 84.3,
      "band": "mid-cost",
      "url": "/economy/states/arizona"
    },
    {
      "code": "OH",
      "name": "Ohio",
      "index": 99.7,
      "labor": 97,
      "energy": 107.9,
      "band": "mid-cost",
      "url": "/economy/states/ohio"
    },
    {
      "code": "ID",
      "name": "Idaho",
      "index": 99.8,
      "labor": 95.9,
      "energy": 111.6,
      "band": "mid-cost",
      "url": "/economy/states/idaho"
    },
    {
      "code": "UT",
      "name": "Utah",
      "index": 100.2,
      "labor": 100.1,
      "energy": 100.5,
      "band": "mid-cost",
      "url": "/economy/states/utah"
    },
    {
      "code": "NE",
      "name": "Nebraska",
      "index": 100.6,
      "labor": 99.1,
      "energy": 105.1,
      "band": "mid-cost",
      "url": "/economy/states/nebraska"
    },
    {
      "code": "MO",
      "name": "Missouri",
      "index": 101.5,
      "labor": 99.5,
      "energy": 107.3,
      "band": "mid-cost",
      "url": "/economy/states/missouri"
    },
    {
      "code": "VA",
      "name": "Virginia",
      "index": 101.7,
      "labor": 101.7,
      "energy": 101.5,
      "band": "mid-cost",
      "url": "/economy/states/virginia"
    },
    {
      "code": "PA",
      "name": "Pennsylvania",
      "index": 101.9,
      "labor": 99.2,
      "energy": 110.1,
      "band": "mid-cost",
      "url": "/economy/states/pennsylvania"
    },
    {
      "code": "ND",
      "name": "North Dakota",
      "index": 102,
      "labor": 105.8,
      "energy": 90.7,
      "band": "mid-cost",
      "url": "/economy/states/north-dakota"
    },
    {
      "code": "NV",
      "name": "Nevada",
      "index": 103,
      "labor": 100.4,
      "energy": 110.8,
      "band": "mid-cost",
      "url": "/economy/states/nevada"
    },
    {
      "code": "WI",
      "name": "Wisconsin",
      "index": 103.8,
      "labor": 102.3,
      "energy": 108.5,
      "band": "mid-cost",
      "url": "/economy/states/wisconsin"
    },
    {
      "code": "IL",
      "name": "Illinois",
      "index": 104.6,
      "labor": 100.8,
      "energy": 116.1,
      "band": "mid-cost",
      "url": "/economy/states/illinois"
    },
    {
      "code": "NY",
      "name": "New York",
      "index": 106.3,
      "labor": 104.7,
      "energy": 110.9,
      "band": "high-cost",
      "url": "/economy/states/new-york"
    },
    {
      "code": "OR",
      "name": "Oregon",
      "index": 106.4,
      "labor": 109.8,
      "energy": 96.3,
      "band": "high-cost",
      "url": "/economy/states/oregon"
    },
    {
      "code": "MN",
      "name": "Minnesota",
      "index": 109.1,
      "labor": 108.3,
      "energy": 111.6,
      "band": "high-cost",
      "url": "/economy/states/minnesota"
    },
    {
      "code": "CO",
      "name": "Colorado",
      "index": 109.7,
      "labor": 109.1,
      "energy": 111.6,
      "band": "high-cost",
      "url": "/economy/states/colorado"
    },
    {
      "code": "WY",
      "name": "Wyoming",
      "index": 110,
      "labor": 114.9,
      "energy": 95.4,
      "band": "high-cost",
      "url": "/economy/states/wyoming"
    },
    {
      "code": "VT",
      "name": "Vermont",
      "index": 112.2,
      "labor": 102.7,
      "energy": 140.7,
      "band": "high-cost",
      "url": "/economy/states/vermont"
    },
    {
      "code": "DE",
      "name": "Delaware",
      "index": 116.7,
      "labor": 111.1,
      "energy": 133.5,
      "band": "high-cost",
      "url": "/economy/states/delaware"
    },
    {
      "code": "WA",
      "name": "Washington",
      "index": 117.1,
      "labor": 130,
      "energy": 78.5,
      "band": "high-cost",
      "url": "/economy/states/washington"
    },
    {
      "code": "MD",
      "name": "Maryland",
      "index": 119,
      "labor": 109.5,
      "energy": 147.3,
      "band": "high-cost",
      "url": "/economy/states/maryland"
    },
    {
      "code": "ME",
      "name": "Maine",
      "index": 122,
      "labor": 111,
      "energy": 155,
      "band": "high-cost",
      "url": "/economy/states/maine"
    },
    {
      "code": "NJ",
      "name": "New Jersey",
      "index": 122.8,
      "labor": 106.8,
      "energy": 170.7,
      "band": "high-cost",
      "url": "/economy/states/new-jersey"
    },
    {
      "code": "CT",
      "name": "Connecticut",
      "index": 128.6,
      "labor": 110.7,
      "energy": 182.1,
      "band": "high-cost",
      "url": "/economy/states/connecticut"
    },
    {
      "code": "NH",
      "name": "New Hampshire",
      "index": 129.9,
      "labor": 109.7,
      "energy": 190.5,
      "band": "high-cost",
      "url": "/economy/states/new-hampshire"
    },
    {
      "code": "MA",
      "name": "Massachusetts",
      "index": 134,
      "labor": 109.7,
      "energy": 206.9,
      "band": "high-cost",
      "url": "/economy/states/massachusetts"
    },
    {
      "code": "DC",
      "name": "District of Columbia",
      "index": 136.3,
      "labor": 122.8,
      "energy": 176.8,
      "band": "high-cost",
      "url": "/economy/states/district-of-columbia"
    },
    {
      "code": "CA",
      "name": "California",
      "index": 138.6,
      "labor": 109.4,
      "energy": 226.2,
      "band": "high-cost",
      "url": "/economy/states/california"
    },
    {
      "code": "RI",
      "name": "Rhode Island",
      "index": 139.1,
      "labor": 102.2,
      "energy": 249.8,
      "band": "high-cost",
      "url": "/economy/states/rhode-island"
    },
    {
      "code": "AK",
      "name": "Alaska",
      "index": 153.6,
      "labor": 128.4,
      "energy": 229.2,
      "band": "high-cost",
      "url": "/economy/states/alaska"
    },
    {
      "code": "HI",
      "name": "Hawaii",
      "index": 213.3,
      "labor": 126.7,
      "energy": 473,
      "band": "high-cost",
      "url": "/economy/states/hawaii"
    }
  ],
  "methodology": {
    "name": "MFG Calcs State Cost-to-Manufacture Index (SCMI)",
    "slug": "us-manufacturing-state-cost-index",
    "version": "1.0.0",
    "url": "https://www.mfgcalcs.com/signals/state-cost-index",
    "formula": "One deterministic index of what it costs to MANUFACTURE in each U.S. state, national average = 100 (higher = costlier), joining two live cost factors. Per state, each factor is on a national = 100 scale: labor = the state's manufacturing-wage index (national median = 100), taken as-is; energy = the state's industrial electricity price reindexed to the national price (byState / national x 100). Composite index = 0.75 x labor + 0.25 x energy. Because both factors are national = 100 by construction, the national reference stays about 100. States are banded relative to 100: below 95 low-cost, 95 to 105 mid-cost, above 105 high-cost.",
    "weights": "FROZEN v1.0.0 weights (sum to 100%): labor 75%, energy 25%. Labor dominates manufacturing operating cost; industrial energy is the next controllable site cost. Pinned and versioned, never tuned to a result.",
    "unit": "index, national average = 100; higher = costlier.",
    "asOfNote": "Stamped from the industrial electricity price period, the more recent and precise of the two source periods.",
    "scope": "An ILLUSTRATIVE composite of two live cost factors (manufacturing wages and industrial electricity), not a full site-selection cost model. It excludes taxes, land, and incentives. Its value is a frozen, reproducible methodology: the same two series, weights, and construction every refresh, so the number is comparable over time and anyone can rebuild it from the cited public data.",
    "source": "U.S. federal open data: BLS Occupational Employment and Wage Statistics (per-state manufacturing wages) and EIA industrial electricity prices, joined by state.",
    "provenance": "Derived from public-domain U.S. government series. Redistributable.",
    "license": "https://creativecommons.org/licenses/by/4.0/",
    "attribution": "MFG Calcs (mfgcalcs.com)",
    "stateCount": 51,
    "national": 100,
    "asOf": "2026-06"
  }
}
