  "version": "2.0.0",
  "asOf": "2026-06",
  "familyCount": 57,
  "headline": {
    "fragility": 36.7,
    "band": "moderate",
    "isLowerBound": true
  },
  "weights": {
    "concentration": 0.35,
    "dependence": 0.3,
    "tariffExposure": 0.2,
    "fxVolatility": 0.15
  },
  "mostFragile": [
    {
      "family": "steel-fasteners",
      "label": "Steel fasteners",
      "fragility": 60.2,
      "band": "fragile",
      "concentration": 61.6,
      "concentrationIsLowerBound": true,
      "dependence": 32,
      "tariffExposure": 100,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-fasteners"
    },
    {
      "family": "wire-cable",
      "label": "Insulated wire and cable",
      "fragility": 60,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 49.7,
      "tariffExposure": 22.6,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/wire-cable"
    },
    {
      "family": "industrial-lighting",
      "label": "Lamps and LED lighting",
      "fragility": 59.6,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 55.1,
      "tariffExposure": 25.4,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/industrial-lighting"
    },
    {
      "family": "batteries",
      "label": "Batteries and storage cells",
      "fragility": 58,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 45.2,
      "tariffExposure": 32.2,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/batteries"
    },
    {
      "family": "steel-springs-chain",
      "label": "Springs, chain, and wire mesh",
      "fragility": 55,
      "band": "moderate",
      "concentration": 70.8,
      "concentrationIsLowerBound": true,
      "dependence": 35.3,
      "tariffExposure": 70.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-springs-chain"
    },
    {
      "family": "hand-tools",
      "label": "Hand tools",
      "fragility": 51.2,
      "band": "moderate",
      "concentration": 73.6,
      "concentrationIsLowerBound": true,
      "dependence": 30,
      "tariffExposure": 43.6,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/hand-tools"
    },
    {
      "family": "steel-flat-rolled",
      "label": "Steel flat-rolled products",
      "fragility": 49.3,
      "band": "moderate",
      "concentration": 56.4,
      "concentrationIsLowerBound": true,
      "dependence": 29.8,
      "tariffExposure": 87.1,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-flat-rolled"
    },
    {
      "family": "iron-steel-articles",
      "label": "Iron and steel castings and articles",
      "fragility": 48.7,
      "band": "moderate",
      "concentration": 52.4,
      "concentrationIsLowerBound": true,
      "dependence": 27.4,
      "tariffExposure": 95.6,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/iron-steel-articles"
    }
  ],
  "mostResilient": [
    {
      "family": "turbines",
      "label": "Turbines and fluid-power drives",
      "fragility": 23.1,
      "band": "resilient",
      "concentration": 37.6,
      "concentrationIsLowerBound": true,
      "dependence": 18.4,
      "tariffExposure": 6.1,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/turbines"
    },
    {
      "family": "abrasives",
      "label": "Abrasives and grinding wheels",
      "fragility": 23.2,
      "band": "resilient",
      "concentration": 27.6,
      "concentrationIsLowerBound": true,
      "dependence": 13.6,
      "tariffExposure": 19.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/abrasives"
    },
    {
      "family": "industrial-furnaces",
      "label": "Industrial furnaces and ovens",
      "fragility": 24.4,
      "band": "resilient",
      "concentration": 31.2,
      "concentrationIsLowerBound": true,
      "dependence": 17.1,
      "tariffExposure": 20,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/industrial-furnaces"
    },
    {
      "family": "foundry-metallurgy",
      "label": "Foundry and rolling equipment",
      "fragility": 25.4,
      "band": "resilient",
      "concentration": 34,
      "concentrationIsLowerBound": true,
      "dependence": 16.7,
      "tariffExposure": 20.5,
      "fxVolatility": 29.2,
      "topCountry": "Italy",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/foundry-metallurgy"
    },
    {
      "family": "measuring-instruments",
      "label": "Measuring and inspection instruments",
      "fragility": 25.4,
      "band": "resilient",
      "concentration": 32,
      "concentrationIsLowerBound": true,
      "dependence": 17.2,
      "tariffExposure": 17.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/measuring-instruments"
    },
    {
      "family": "power-transmission",
      "label": "Gears and power transmission",
      "fragility": 25.6,
      "band": "resilient",
      "concentration": 31.6,
      "concentrationIsLowerBound": true,
      "dependence": 12.5,
      "tariffExposure": 32.1,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/power-transmission"
    },
    {
      "family": "cutting-tools",
      "label": "Cutting tools and inserts",
      "fragility": 26.2,
      "band": "resilient",
      "concentration": 31.6,
      "concentrationIsLowerBound": true,
      "dependence": 17,
      "tariffExposure": 28.5,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/cutting-tools"
    },
    {
      "family": "heat-exchange",
      "label": "Heat exchange and process heating",
      "fragility": 26.2,
      "band": "resilient",
      "concentration": 32.4,
      "concentrationIsLowerBound": true,
      "dependence": 15.9,
      "tariffExposure": 22.3,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/heat-exchange"
    }
  ],
  "rows": [
    {
      "family": "steel-fasteners",
      "label": "Steel fasteners",
      "fragility": 60.2,
      "band": "fragile",
      "concentration": 61.6,
      "concentrationIsLowerBound": true,
      "dependence": 32,
      "tariffExposure": 100,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-fasteners"
    },
    {
      "family": "wire-cable",
      "label": "Insulated wire and cable",
      "fragility": 60,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 49.7,
      "tariffExposure": 22.6,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/wire-cable"
    },
    {
      "family": "industrial-lighting",
      "label": "Lamps and LED lighting",
      "fragility": 59.6,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 55.1,
      "tariffExposure": 25.4,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/industrial-lighting"
    },
    {
      "family": "batteries",
      "label": "Batteries and storage cells",
      "fragility": 58,
      "band": "moderate",
      "concentration": 100,
      "concentrationIsLowerBound": true,
      "dependence": 45.2,
      "tariffExposure": 32.2,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/batteries"
    },
    {
      "family": "steel-springs-chain",
      "label": "Springs, chain, and wire mesh",
      "fragility": 55,
      "band": "moderate",
      "concentration": 70.8,
      "concentrationIsLowerBound": true,
      "dependence": 35.3,
      "tariffExposure": 70.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-springs-chain"
    },
    {
      "family": "hand-tools",
      "label": "Hand tools",
      "fragility": 51.2,
      "band": "moderate",
      "concentration": 73.6,
      "concentrationIsLowerBound": true,
      "dependence": 30,
      "tariffExposure": 43.6,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/hand-tools"
    },
    {
      "family": "steel-flat-rolled",
      "label": "Steel flat-rolled products",
      "fragility": 49.3,
      "band": "moderate",
      "concentration": 56.4,
      "concentrationIsLowerBound": true,
      "dependence": 29.8,
      "tariffExposure": 87.1,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-flat-rolled"
    },
    {
      "family": "iron-steel-articles",
      "label": "Iron and steel castings and articles",
      "fragility": 48.7,
      "band": "moderate",
      "concentration": 52.4,
      "concentrationIsLowerBound": true,
      "dependence": 27.4,
      "tariffExposure": 95.6,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/iron-steel-articles"
    },
    {
      "family": "molds-dies",
      "label": "Molds and die sets",
      "fragility": 44.7,
      "band": "moderate",
      "concentration": 71.6,
      "concentrationIsLowerBound": true,
      "dependence": 37.2,
      "tariffExposure": 26.4,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/molds-dies"
    },
    {
      "family": "powered-hand-tools",
      "label": "Powered hand tools",
      "fragility": 44.6,
      "band": "moderate",
      "concentration": 80,
      "concentrationIsLowerBound": true,
      "dependence": 29.2,
      "tariffExposure": 24.2,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/powered-hand-tools"
    },
    {
      "family": "aluminum-articles",
      "label": "Aluminum articles",
      "fragility": 44.4,
      "band": "moderate",
      "concentration": 48.4,
      "concentrationIsLowerBound": true,
      "dependence": 22.7,
      "tariffExposure": 88.2,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/aluminum-articles"
    },
    {
      "family": "technical-ceramics",
      "label": "Technical and refractory ceramics",
      "fragility": 44.3,
      "band": "moderate",
      "concentration": 70.4,
      "concentrationIsLowerBound": true,
      "dependence": 31.6,
      "tariffExposure": 18.9,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/technical-ceramics"
    },
    {
      "family": "engines",
      "label": "Internal combustion engines",
      "fragility": 44,
      "band": "moderate",
      "concentration": 71.2,
      "concentrationIsLowerBound": true,
      "dependence": 35.9,
      "tariffExposure": 13.8,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/engines"
    },
    {
      "family": "switchgear-connectors",
      "label": "Switchgear, connectors, and controls",
      "fragility": 42.5,
      "band": "moderate",
      "concentration": 63.6,
      "concentrationIsLowerBound": true,
      "dependence": 37.2,
      "tariffExposure": 17.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/switchgear-connectors"
    },
    {
      "family": "copper-semis",
      "label": "Copper semi-finished products",
      "fragility": 42,
      "band": "moderate",
      "concentration": 41.6,
      "concentrationIsLowerBound": true,
      "dependence": 25.8,
      "tariffExposure": 82.3,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/copper-semis"
    },
    {
      "family": "tanks-vessels",
      "label": "Tanks, vessels, and gas cylinders",
      "fragility": 41.2,
      "band": "moderate",
      "concentration": 38.8,
      "concentrationIsLowerBound": true,
      "dependence": 20,
      "tariffExposure": 80.3,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/tanks-vessels"
    },
    {
      "family": "machine-tools-cutting",
      "label": "Metal-cutting machine tools",
      "fragility": 39.9,
      "band": "moderate",
      "concentration": 58.8,
      "concentrationIsLowerBound": true,
      "dependence": 26.8,
      "tariffExposure": 24.4,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/machine-tools-cutting"
    },
    {
      "family": "steel-structures",
      "label": "Fabricated structural steel",
      "fragility": 39.8,
      "band": "moderate",
      "concentration": 39.6,
      "concentrationIsLowerBound": true,
      "dependence": 22.1,
      "tariffExposure": 68.6,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-structures"
    },
    {
      "family": "aluminum-semis",
      "label": "Aluminum semi-finished products",
      "fragility": 39.3,
      "band": "moderate",
      "concentration": 28.8,
      "concentrationIsLowerBound": true,
      "dependence": 20.1,
      "tariffExposure": 100,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/aluminum-semis"
    },
    {
      "family": "nickel-alloys",
      "label": "Nickel and nickel alloys",
      "fragility": 39.1,
      "band": "moderate",
      "concentration": 66.4,
      "concentrationIsLowerBound": true,
      "dependence": 35.7,
      "tariffExposure": 9.9,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/nickel-alloys"
    },
    {
      "family": "stainless-steel",
      "label": "Stainless steel mill products",
      "fragility": 38.7,
      "band": "moderate",
      "concentration": 28.8,
      "concentrationIsLowerBound": true,
      "dependence": 17.1,
      "tariffExposure": 88.4,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/stainless-steel"
    },
    {
      "family": "steel-pipe-tube",
      "label": "Steel pipe and tube",
      "fragility": 37.6,
      "band": "moderate",
      "concentration": 28.4,
      "concentrationIsLowerBound": true,
      "dependence": 16.2,
      "tariffExposure": 86,
      "fxVolatility": null,
      "topCountry": "South Korea",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-pipe-tube"
    },
    {
      "family": "glass-fiber",
      "label": "Glass fiber and reinforcements",
      "fragility": 37.5,
      "band": "moderate",
      "concentration": 54.4,
      "concentrationIsLowerBound": true,
      "dependence": 28.6,
      "tariffExposure": 21.5,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/glass-fiber"
    },
    {
      "family": "electric-motors",
      "label": "Electric motors and generators",
      "fragility": 36.8,
      "band": "moderate",
      "concentration": 50.4,
      "concentrationIsLowerBound": true,
      "dependence": 29,
      "tariffExposure": 24.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/electric-motors"
    },
    {
      "family": "plastics-resins",
      "label": "Plastics in primary forms",
      "fragility": 36.8,
      "band": "moderate",
      "concentration": 59.2,
      "concentrationIsLowerBound": true,
      "dependence": 33.2,
      "tariffExposure": 14.5,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/plastics-resins"
    },
    {
      "family": "plastics-rubber-machinery",
      "label": "Plastics and rubber machinery",
      "fragility": 36.6,
      "band": "moderate",
      "concentration": 52.8,
      "concentrationIsLowerBound": true,
      "dependence": 28.8,
      "tariffExposure": 25.7,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/plastics-rubber-machinery"
    },
    {
      "family": "filtering-separation",
      "label": "Filtering and separation equipment",
      "fragility": 36,
      "band": "moderate",
      "concentration": 50.8,
      "concentrationIsLowerBound": true,
      "dependence": 30,
      "tariffExposure": 18,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/filtering-separation"
    },
    {
      "family": "steel-long-products",
      "label": "Steel bar, rod, and wire",
      "fragility": 36,
      "band": "moderate",
      "concentration": 33.6,
      "concentrationIsLowerBound": true,
      "dependence": 19.8,
      "tariffExposure": 75.5,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/steel-long-products"
    },
    {
      "family": "specialty-metals",
      "label": "Titanium and tungsten",
      "fragility": 35.9,
      "band": "moderate",
      "concentration": 47.2,
      "concentrationIsLowerBound": true,
      "dependence": 28.9,
      "tariffExposure": 21.3,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/specialty-metals"
    },
    {
      "family": "bearings",
      "label": "Bearings",
      "fragility": 34.6,
      "band": "resilient",
      "concentration": 38.4,
      "concentrationIsLowerBound": true,
      "dependence": 21.5,
      "tariffExposure": 41.6,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/bearings"
    },
    {
      "family": "coatings-paints",
      "label": "Paints, coatings, and finishes",
      "fragility": 34.3,
      "band": "resilient",
      "concentration": 53.6,
      "concentrationIsLowerBound": true,
      "dependence": 29.2,
      "tariffExposure": 17.8,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/coatings-paints"
    },
    {
      "family": "semiconductor-equipment",
      "label": "Semiconductor and display equipment",
      "fragility": 34.1,
      "band": "resilient",
      "concentration": 57.2,
      "concentrationIsLowerBound": true,
      "dependence": 24.4,
      "tariffExposure": 2,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/semiconductor-equipment"
    },
    {
      "family": "compressors-fans",
      "label": "Compressors and fans",
      "fragility": 33.8,
      "band": "resilient",
      "concentration": 46.8,
      "concentrationIsLowerBound": true,
      "dependence": 23.2,
      "tariffExposure": 24.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/compressors-fans"
    },
    {
      "family": "packaging-machinery",
      "label": "Packaging and filling machinery",
      "fragility": 32.6,
      "band": "resilient",
      "concentration": 49.2,
      "concentrationIsLowerBound": true,
      "dependence": 24.7,
      "tariffExposure": 18,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/packaging-machinery"
    },
    {
      "family": "passive-components",
      "label": "Capacitors, resistors, and circuit boards",
      "fragility": 31.5,
      "band": "resilient",
      "concentration": 46,
      "concentrationIsLowerBound": true,
      "dependence": 19.3,
      "tariffExposure": 24.6,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/passive-components"
    },
    {
      "family": "rubber-products",
      "label": "Rubber materials and products",
      "fragility": 31.4,
      "band": "resilient",
      "concentration": 41.2,
      "concentrationIsLowerBound": true,
      "dependence": 25.6,
      "tariffExposure": 18.5,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/rubber-products"
    },
    {
      "family": "adhesives-sealants",
      "label": "Adhesives and sealants",
      "fragility": 31.1,
      "band": "resilient",
      "concentration": 44,
      "concentrationIsLowerBound": true,
      "dependence": 23.7,
      "tariffExposure": 21.1,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/adhesives-sealants"
    },
    {
      "family": "lifting-handling",
      "label": "Lifting and handling equipment",
      "fragility": 30.9,
      "band": "resilient",
      "concentration": 37.2,
      "concentrationIsLowerBound": true,
      "dependence": 16.6,
      "tariffExposure": 36.5,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/lifting-handling"
    },
    {
      "family": "pumps",
      "label": "Pumps for liquids",
      "fragility": 30.9,
      "band": "resilient",
      "concentration": 40,
      "concentrationIsLowerBound": true,
      "dependence": 21.4,
      "tariffExposure": 24.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/pumps"
    },
    {
      "family": "welding-equipment",
      "label": "Welding equipment",
      "fragility": 30.4,
      "band": "resilient",
      "concentration": 41.2,
      "concentrationIsLowerBound": true,
      "dependence": 18.1,
      "tariffExposure": 20.6,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/welding-equipment"
    },
    {
      "family": "gaskets-seals",
      "label": "Gaskets and mechanical seals",
      "fragility": 30.1,
      "band": "resilient",
      "concentration": 40,
      "concentrationIsLowerBound": true,
      "dependence": 22.3,
      "tariffExposure": 19.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/gaskets-seals"
    },
    {
      "family": "valves",
      "label": "Valves and fluid controls",
      "fragility": 29.8,
      "band": "resilient",
      "concentration": 37.6,
      "concentrationIsLowerBound": true,
      "dependence": 20.1,
      "tariffExposure": 25.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/valves"
    },
    {
      "family": "carbon-insulators",
      "label": "Carbon products and insulators",
      "fragility": 29.7,
      "band": "resilient",
      "concentration": 40.8,
      "concentrationIsLowerBound": true,
      "dependence": 22,
      "tariffExposure": 28.9,
      "fxVolatility": 20,
      "topCountry": "China",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/carbon-insulators"
    },
    {
      "family": "semiconductors",
      "label": "Semiconductors and integrated circuits",
      "fragility": 29.4,
      "band": "resilient",
      "concentration": 48.8,
      "concentrationIsLowerBound": true,
      "dependence": 24,
      "tariffExposure": 3.5,
      "fxVolatility": null,
      "topCountry": "Taiwan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/semiconductors"
    },
    {
      "family": "machine-tools-forming",
      "label": "Metal-forming machine tools",
      "fragility": 28.7,
      "band": "resilient",
      "concentration": 39.2,
      "concentrationIsLowerBound": true,
      "dependence": 18.9,
      "tariffExposure": 24.8,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/machine-tools-forming"
    },
    {
      "family": "optical-components",
      "label": "Optical elements and lenses",
      "fragility": 27.9,
      "band": "resilient",
      "concentration": 32.4,
      "concentrationIsLowerBound": true,
      "dependence": 16.7,
      "tariffExposure": 25.6,
      "fxVolatility": 42.7,
      "topCountry": "Japan",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/optical-components"
    },
    {
      "family": "transformers-power",
      "label": "Transformers and power supplies",
      "fragility": 27.4,
      "band": "resilient",
      "concentration": 31.2,
      "concentrationIsLowerBound": true,
      "dependence": 19.5,
      "tariffExposure": 25.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/transformers-power"
    },
    {
      "family": "industrial-robots",
      "label": "Robots and automated machinery",
      "fragility": 26.7,
      "band": "resilient",
      "concentration": 34,
      "concentrationIsLowerBound": true,
      "dependence": 19.1,
      "tariffExposure": 23.5,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/industrial-robots"
    },
    {
      "family": "plastic-semis",
      "label": "Plastic semi-finished products",
      "fragility": 26.6,
      "band": "resilient",
      "concentration": 36,
      "concentrationIsLowerBound": true,
      "dependence": 22.9,
      "tariffExposure": 19.4,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/plastic-semis"
    },
    {
      "family": "cutting-tools",
      "label": "Cutting tools and inserts",
      "fragility": 26.2,
      "band": "resilient",
      "concentration": 31.6,
      "concentrationIsLowerBound": true,
      "dependence": 17,
      "tariffExposure": 28.5,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/cutting-tools"
    },
    {
      "family": "heat-exchange",
      "label": "Heat exchange and process heating",
      "fragility": 26.2,
      "band": "resilient",
      "concentration": 32.4,
      "concentrationIsLowerBound": true,
      "dependence": 15.9,
      "tariffExposure": 22.3,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/heat-exchange"
    },
    {
      "family": "power-transmission",
      "label": "Gears and power transmission",
      "fragility": 25.6,
      "band": "resilient",
      "concentration": 31.6,
      "concentrationIsLowerBound": true,
      "dependence": 12.5,
      "tariffExposure": 32.1,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/power-transmission"
    },
    {
      "family": "foundry-metallurgy",
      "label": "Foundry and rolling equipment",
      "fragility": 25.4,
      "band": "resilient",
      "concentration": 34,
      "concentrationIsLowerBound": true,
      "dependence": 16.7,
      "tariffExposure": 20.5,
      "fxVolatility": 29.2,
      "topCountry": "Italy",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/foundry-metallurgy"
    },
    {
      "family": "measuring-instruments",
      "label": "Measuring and inspection instruments",
      "fragility": 25.4,
      "band": "resilient",
      "concentration": 32,
      "concentrationIsLowerBound": true,
      "dependence": 17.2,
      "tariffExposure": 17.2,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/measuring-instruments"
    },
    {
      "family": "industrial-furnaces",
      "label": "Industrial furnaces and ovens",
      "fragility": 24.4,
      "band": "resilient",
      "concentration": 31.2,
      "concentrationIsLowerBound": true,
      "dependence": 17.1,
      "tariffExposure": 20,
      "fxVolatility": 29.2,
      "topCountry": "Germany",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/industrial-furnaces"
    },
    {
      "family": "abrasives",
      "label": "Abrasives and grinding wheels",
      "fragility": 23.2,
      "band": "resilient",
      "concentration": 27.6,
      "concentrationIsLowerBound": true,
      "dependence": 13.6,
      "tariffExposure": 19.1,
      "fxVolatility": 37.3,
      "topCountry": "Mexico",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/abrasives"
    },
    {
      "family": "turbines",
      "label": "Turbines and fluid-power drives",
      "fragility": 23.1,
      "band": "resilient",
      "concentration": 37.6,
      "concentrationIsLowerBound": true,
      "dependence": 18.4,
      "tariffExposure": 6.1,
      "fxVolatility": 21.4,
      "topCountry": "Canada",
      "fragilityIsLowerBound": true,
      "url": "/tariffs/turbines"
    }
  ],
  "methodology": {
    "name": "MFG Calcs Supply Chain Fragility Index",
    "slug": "us-manufacturing-supply-chain-fragility-index",
    "version": "2.0.0",
    "url": "https://www.mfgcalcs.com/signals/supply-chain-fragility",
    "formula": "A branded 0-100 supply-chain fragility score per manufacturing family (higher = more fragile), plus a manufacturing-wide headline. Four sub-scores per family, each 0-100 where higher = more fragile: concentration = min(100, import HHI / 2500 x 100); dependence = the single largest retained source country's share of true family import value, clamped to 0-100; tariffExposure = min(100, effective calculated-duty rate percent x 2); fxVolatility = min(100, the top source currency's annualized contiguous month-over-month log-return volatility percent x 5). The composite is the weighted average of AVAILABLE sub-scores, with frozen weights renormalized over available components. When HHI comes from a partial retained-source board, concentration and the monotone composite are explicitly lower bounds. The headline is the simple mean of family score floors.",
    "weights": "FROZEN v2.0.0 weights (sum to 100%): concentration 35%, dependence 30%, tariffExposure 20%, fxVolatility 15%. Pinned and versioned, never tuned to a result; rescaled over the available components when a family has no tracked currency.",
    "bands": "Below 35 resilient; 35 to 60 inclusive moderate; above 60 fragile.",
    "unit": "index, 0-100, higher = more fragile; sub-scores 0-100 on the same scale.",
    "scope": "An ILLUSTRATIVE composite, not an official statistic. Its value is a frozen, reproducible methodology: the same series, sub-scores, and weights every refresh, so the number is comparable over time and anyone can rebuild it from the cited public data. FX volatility is only available for families whose top source uses a tracked currency (euro, yuan, peso, Canadian dollar, or yen).",
    "source": "MFG Calcs Reshoring Index (effective tariff rate and import Herfindahl-Hirschman concentration) and Sourcing Diversification board (top source country and its import share), both over USITC DataWeb; plus FRED H.10 exchange rates for currency volatility. All public data.",
    "provenance": "Derived from public U.S. government trade and exchange-rate series and the site's own committed reshoring and sourcing aggregates. Redistributable.",
    "caveat": "Retained-source HHI omits the residual source tail in incomplete boards. Rows expose concentrationIsLowerBound and fragilityIsLowerBound; the headline exposes isLowerBound. A lower-bound band cannot rule out a higher fragility band after complete source coverage.",
    "license": "https://creativecommons.org/licenses/by/4.0/",
    "attribution": "MFG Calcs (mfgcalcs.com)",
    "asOf": "2026-06"
  }
}