Bonding Process Risk Score with bond failure severity of 4 1-10: a worked example
Here is what the math looks like when conditions slip. We hold every other input steady and drop bond failure severity to 4 1-10, then walk the calculation through step by step. Score bonding process risk from failure severity, defect occurrence, and detection strength before release.
The inputs for this scenario
- Bond failure severity: 4 1-10 (the input this scenario stresses; the baseline uses 8)
- Bond defect occurrence: 5 1-10 (held at the documented default)
- Detection weakness: 6 1-10 (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Bonding process risk score = severity score × occurrence score × detection score.
- Bonding process risk score works out to 4.85 score at these inputs, and this is the headline figure for the scenario.
- Bond failure severity works out to 4 1-10 at these inputs.
- Bond defect occurrence works out to 5 1-10 at these inputs.
- Detection weakness works out to 6 1-10 at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where bond failure severity sits at 8 1-10 and the headline result is 6.45 score, this scenario comes in 24.81% below the baseline at 4.85 score.
- The practical read: the gap between this scenario and the baseline is entirely attributable to bond failure severity, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. The 1-10 ratings are judgment-based, so two engineers can score the same mode differently; the score ranks risk but does not by itself prove a process is safe.
Results at a glance
- Bonding process risk score: 4.85 score (headline result)
- Bond failure severity: 4 1-10
- Bond defect occurrence: 5 1-10
- Detection weakness: 6 1-10