Advanced Technical Ceramics worked example
Technical Ceramic Supplier Risk with supply impact severity if it fails of 23 1-10: a worked example
What does the result look like when supply impact severity if it fails reaches 23 1-10? The full calculation is worked below with real intermediate numbers. a purchasing manager needs to compare supplier risk for critical ceramic materials or outsourced processing
The inputs for this scenario
- Supply impact severity if it fails: 23 1-10 (raised for this scenario; the documented default is 9)
- Likelihood of supply disruption: 5 1-10 (unchanged)
- Difficulty detecting or recovering: 7 1-10 (unchanged)
Working through the calculation
- Applying the documented formula (Technical ceramic supplier risk score = severity score × likelihood score × detection difficulty score) to the inputs above produces each figure below.
- At this operating point the engine returns 12.7 score for technical ceramic supplier risk score, the number this scenario is built around.
- At this operating point the engine returns 23 1-10 for supply impact severity.
- At this operating point the engine returns 5 1-10 for disruption likelihood.
- At this operating point the engine returns 7 1-10 for detection or recovery difficulty.
How this compares with the baseline
- Against the tool's baseline example, where supply impact severity if it fails sits at 9 1-10 and the headline result is 7.1 score, this scenario comes in 78.87% above the baseline at 12.7 score.
- A figure at this level is achievable when supply impact severity if it fails is genuinely sustained, not just peaked for a shift. It's an ordinal, subjective score — a 9x5x7 isn't literally three times riskier than a 9x5x2.3, so use it to rank and trigger action, not as an absolute probability.
Results at a glance
- Technical ceramic supplier risk score: 12.7 score (headline result)
- Supply impact severity: 23 1-10
- Disruption likelihood: 5 1-10
- Detection or recovery difficulty: 7 1-10
Run it with your numbers
- Every input above is editable in the live Technical Ceramic Supplier Risk calculator, which recalculates instantly and can be shared with the inputs intact.