Aerospace & Defense Manufacturing worked example

Aerospace Inspection Burden at 35% as9100 documentation review allowance: a worked example

What does the result look like when as9100 documentation review allowance reaches 35%? The full calculation is worked below with real intermediate numbers. a quality engineer needs to estimate inspection labor for precision machined aerospace components or flight assemblies

The inputs for this scenario

  • Inspection characteristics to verify: 320 characteristics (unchanged)
  • Inspection verification pace: 4.8 characteristics/min (unchanged)
  • AS9100 documentation review allowance: 35 % (raised for this scenario; the documented default is 30)

Working through the calculation

  • Applying the documented formula (Base measurement time = inspection characteristics รท inspection verification pace) to the inputs above produces each figure below.
  • At this operating point the engine returns 90 inspection hr for total aerospace inspection burden, the number this scenario is built around.
  • At this operating point the engine returns 66.67 inspection hr for base measurement time.
  • At this operating point the engine returns 35 % for documentation and setup allowance.
  • At this operating point the engine returns 4.8 characteristics/min for inspection verification pace.

How this compares with the baseline

  • Against the tool's baseline example, where as9100 documentation review allowance sits at 30% and the headline result is 86.67 inspection hr, this scenario comes in 3.85% above the baseline at 90 inspection hr.
  • A figure at this level is achievable when as9100 documentation review allowance is genuinely sustained, not just peaked for a shift. It assumes a steady average pace across all characteristics; in reality GD&T callouts, true-position checks, and CMM program runs vary widely, so use weighted paces for mixed-difficulty parts.

Results at a glance

  • Total aerospace inspection burden: 90 inspection hr (headline result)
  • Base measurement time: 66.67 inspection hr
  • Documentation and setup allowance: 35 %
  • Inspection verification pace: 4.8 characteristics/min

Run it with your numbers

  • Every input above is editable in the live Aerospace Inspection Burden calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.