Aerospace & Defense Manufacturing worked example
Aerospace Inspection Burden at 22% as9100 documentation review allowance: a worked example
This worked example runs the aerospace inspection burden numbers for a tougher week than the baseline: 22% as9100 documentation review allowance instead of the typical 30%. Estimate inspection hours for aerospace parts from inspection characteristics, inspection pace, and added AS9100 review allowance.
The inputs for this scenario
- Inspection characteristics to verify: 320 characteristics (held at the documented default)
- Inspection verification pace: 4.8 characteristics/min (held at the documented default)
- AS9100 documentation review allowance: 22 % (the input this scenario stresses; the baseline uses 30)
Working through the calculation
- The calculation starts from the formula this tool documents: Base measurement time = inspection characteristics รท inspection verification pace.
- Total aerospace inspection burden works out to 81.33 inspection hr at these inputs, and this is the headline figure for the scenario.
- Base measurement time works out to 66.67 inspection hr at these inputs.
- Documentation and setup allowance works out to 22 % at these inputs.
- Inspection verification pace works out to 4.8 characteristics/min at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where as9100 documentation review allowance sits at 30% and the headline result is 86.67 inspection hr, this scenario comes in 6.15% below the baseline at 81.33 inspection hr.
- Use it when planning first-article inspection, quoting inspection labor, or sizing the metrology cell for a new aerospace program. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- Total aerospace inspection burden: 81.33 inspection hr (headline result)
- Base measurement time: 66.67 inspection hr
- Documentation and setup allowance: 22 %
- Inspection verification pace: 4.8 characteristics/min
Run it with your numbers
- To rerun this with your own numbers, open the live Aerospace Inspection Burden calculator, set as9100 documentation review allowance to your actual value, and adjust the remaining inputs to match your operation.