Building Materials Manufacturing worked example
Cement Plant OEE at 68% performance: a worked example
This worked example runs the cement plant oee numbers for a tougher week than the baseline: 68% performance instead of the typical 95%. Calculate OEE for Building Materials Manufacturing from availability, performance, and quality to see how much of planned production time becomes good output.
The inputs for this scenario
- Operating (run) time: 410 min (held at the documented default)
- Planned production time: 480 min (held at the documented default)
- Performance: 68 % (the input this scenario stresses; the baseline uses 95)
- Quality (first-pass yield): 98 % (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Availability = operating time ÷ planned production time.
- OEE works out to 56.92 % at these inputs, and this is the headline figure for the scenario.
- Availability works out to 85.42 % at these inputs.
- Performance works out to 68 % at these inputs.
- Quality works out to 98 % at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where performance sits at 95% and the headline result is 79.52 %, this scenario comes in 28.42% below the baseline at 56.92 %.
- Use it on any continuous cement asset — kiln, raw mill, cement mill, or packing line — when you have run time, planned time, and reasonable performance and quality estimates. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- OEE: 56.92 % (headline result)
- Availability: 85.42 %
- Performance: 68 %
- Quality: 98 %
Run it with your numbers
- To rerun this with your own numbers, open the live Cement Plant OEE calculator, set performance to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.