Defense Electronics & Ruggedized Systems worked example
Obsolescence Risk Score with mission or program impact severity of 15 score: a worked example
This scenario runs the obsolescence risk score calculation on the strong side: mission or program impact severity of 15 score, with every other input held at its documented default. Use it when obsolescence risk in defense electronics and ruggedized systems needs a defensible ranking against other defense electronics and ruggedized systems risks for the next review.
The inputs for this scenario
- Mission or program impact severity: 15 score (raised for this scenario; the documented default is 6)
- Obsolescence occurrence likelihood: 4 score (unchanged)
- Detection and mitigation difficulty: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (DMSMS obsolescence risk score = mission impact severity × obsolescence occurrence likelihood × detection and mitigation difficulty) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for dmsms obsolescence risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for mission or program impact severity.
- At this operating point the engine returns 4 score for obsolescence occurrence likelihood.
- At this operating point the engine returns 3 score for detection and mitigation difficulty.
How this compares with the baseline
- Against the tool's baseline example, where mission or program impact severity sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it during obsolescence reviews, supplier risk assessments, and bill-of-materials triage to rank components for last-time-buys, redesign, or substitution. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- DMSMS obsolescence risk score: 8.15 score (headline result)
- Mission or program impact severity: 15 score
- Obsolescence occurrence likelihood: 4 score
- Detection and mitigation difficulty: 3 score
Run it with your numbers
- Every input above is editable in the live Obsolescence Risk Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.