Doors, Hardware & Access Control Manufacturing worked example
SKU Option Complexity Score with option mix severity score of 15 score: a worked example
This scenario runs the sku option complexity score calculation on the strong side: option mix severity score of 15 score, with every other input held at its documented default. Use it when sku option complexity in doors, hardware and access control manufacturing needs a defensible ranking against other doors, hardware and access control manufacturing risks for the next review.
The inputs for this scenario
- Option mix severity score (1-10): 15 score (raised for this scenario; the documented default is 6)
- Option mix occurrence score (1-10): 4 score (unchanged)
- Configuration detection score (1-10): 3 score (unchanged)
Working through the calculation
- Applying the documented formula (SKU option complexity score = option mix impact severity score × option mix occurrence score × configuration detection control score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for sku option complexity score, the number this scenario is built around.
- At this operating point the engine returns 15 score for option mix impact severity score.
- At this operating point the engine returns 4 score for option mix occurrence score.
- At this operating point the engine returns 3 score for configuration detection control score.
How this compares with the baseline
- Against the tool's baseline example, where option mix severity score sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- Use it when triaging which configurable option combinations to rationalize, add configurator guard-rails to, or pull from the catalog before they cause mis-builds. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- SKU option complexity score: 8.15 score (headline result)
- Option mix impact severity score: 15 score
- Option mix occurrence score: 4 score
- Configuration detection control score: 3 score
Run it with your numbers
- Every input above is editable in the live SKU Option Complexity Score calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.