Doors, Hardware & Access Control Manufacturing worked example
SKU Option Complexity Score with option mix severity score of 3 score: a worked example
This worked example runs the sku option complexity score numbers for a tougher week than the baseline: option mix severity score of 3 score instead of the typical 6 score. Score complexity risk from door sizes, handings, swings, fire ratings, finishes, frame depths, lock functions, keyways, readers, and hardware-set variations.
The inputs for this scenario
- Option mix severity score (1-10): 3 score (the input this scenario stresses; the baseline uses 6)
- Option mix occurrence score (1-10): 4 score (held at the documented default)
- Configuration detection score (1-10): 3 score (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: SKU option complexity score = option mix impact severity score × option mix occurrence score × configuration detection control score.
- SKU option complexity score works out to 3.35 score at these inputs, and this is the headline figure for the scenario.
- Option mix impact severity score works out to 3 score at these inputs.
- Option mix occurrence score works out to 4 score at these inputs.
- Configuration detection control score works out to 3 score at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where option mix severity score sits at 6 score and the headline result is 4.55 score, this scenario comes in 26.37% below the baseline at 3.35 score.
- Use it when triaging which configurable option combinations to rationalize, add configurator guard-rails to, or pull from the catalog before they cause mis-builds. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.
Results at a glance
- SKU option complexity score: 3.35 score (headline result)
- Option mix impact severity score: 3 score
- Option mix occurrence score: 4 score
- Configuration detection control score: 3 score
Run it with your numbers
- To rerun this with your own numbers, open the live SKU Option Complexity Score calculator, set option mix severity score to your actual value, and adjust the remaining inputs to match your operation.