Fixture, Gauge & Workholding Management worked example

Fixture Quote Cost at 72% quote scope included: a worked example

Suppose quote scope included falls to 72%. This page works the full calculation at that level so you can see exactly which result moves and by how much. Estimate quote cost for a fixture package including design, material, machining, purchased components, assembly, tryout, and documentation.

The inputs for this scenario

  • Fixtures quoted: 10 fixtures (held at the documented default)
  • Quoted cost per fixture: 6,800 $ / fixture (held at the documented default)
  • Quote scope included: 72 % (the input this scenario stresses; the baseline uses 100)
  • Fixed design, tryout, or project cost: 7,500 $ (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Variable fixture quote cost = fixtures quoted × quoted cost per fixture × quote scope included.
  • Total fixture quote cost works out to 56,460 $ at these inputs, and this is the headline figure for the scenario.
  • Quoted fixture cost per unit works out to 5,646 $ / piece at these inputs.
  • Variable fixture quote cost works out to 48,960 $ at these inputs.
  • Fixed design, tryout, or project cost works out to 7,500 $ at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where quote scope included sits at 100% and the headline result is 75,500 $, this scenario comes in 25.22% below the baseline at 56,460 $.
  • It computes the total fixture quote by multiplying fixtures quoted by quoted cost per fixture and scope captured, then adding the fixed design, tryout, and project cost. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.

Results at a glance

  • Total fixture quote cost: 56,460 $ (headline result)
  • Quoted fixture cost per unit: 5,646 $ / piece
  • Variable fixture quote cost: 48,960 $
  • Fixed design, tryout, or project cost: 7,500 $