IIoT, SCADA & Edge Connectivity worked example

OT Integration Readiness Score with ot integration severity score of 18 score: a worked example

This scenario runs the ot integration readiness score calculation on the strong side: ot integration severity score of 18 score, with every other input held at its documented default. Use it when an OT lead is ranking which sites or lines to integrate first into MES, historian, or unified namespace, and needs a defensible single-number ranking.

The inputs for this scenario

  • OT integration severity score: 18 score (raised for this scenario; the documented default is 7)
  • OT integration occurrence score: 5 score (unchanged)
  • OT integration detection score: 4 score (unchanged)

Working through the calculation

  • Applying the documented formula (Weighted OT integration readiness score = severity × 0.40 + occurrence × 0.35 + detection × 0.25) to the inputs above produces each figure below.
  • At this operating point the engine returns 9.95 score for weighted ot integration readiness score, the number this scenario is built around.
  • At this operating point the engine returns 18 score for ot integration severity score.
  • At this operating point the engine returns 5 score for ot integration occurrence score.
  • At this operating point the engine returns 4 score for ot integration detection score.

How this compares with the baseline

  • Against the tool's baseline example, where ot integration severity score sits at 7 score and the headline result is 5.55 score, this scenario comes in 79.28% above the baseline at 9.95 score.
  • Use it when prioritizing OT integration work across multiple lines or sites and you need a defensible, repeatable ranking. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Weighted OT integration readiness score: 9.95 score (headline result)
  • OT integration severity score: 18 score
  • OT integration occurrence score: 5 score
  • OT integration detection score: 4 score

Run it with your numbers

  • Every input above is editable in the live OT Integration Readiness Score calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.