IIoT, SCADA & Edge Connectivity worked example

OT Integration Readiness Score with ot integration severity score of 3.5 score: a worked example

This worked example runs the ot integration readiness score numbers for a tougher week than the baseline: ot integration severity score of 3.5 score instead of the typical 7 score. Score OT integration readiness for a site, line, or asset using severity (impact if integration is delayed), occurrence (likelihood the integration runs into trouble), and detection (likelihood current controls catch issues early). The engine returns a weighted readiness risk score.

The inputs for this scenario

  • OT integration severity score: 3.5 score (the input this scenario stresses; the baseline uses 7)
  • OT integration occurrence score: 5 score (held at the documented default)
  • OT integration detection score: 4 score (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Weighted OT integration readiness score = severity × 0.40 + occurrence × 0.35 + detection × 0.25.
  • Weighted OT integration readiness score works out to 4.15 score at these inputs, and this is the headline figure for the scenario.
  • OT integration severity score works out to 3.5 score at these inputs.
  • OT integration occurrence score works out to 5 score at these inputs.
  • OT integration detection score works out to 4 score at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where ot integration severity score sits at 7 score and the headline result is 5.55 score, this scenario comes in 25.23% below the baseline at 4.15 score.
  • Use it when prioritizing OT integration work across multiple lines or sites and you need a defensible, repeatable ranking. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Weighted OT integration readiness score: 4.15 score (headline result)
  • OT integration severity score: 3.5 score
  • OT integration occurrence score: 5 score
  • OT integration detection score: 4 score

Run it with your numbers

  • To rerun this with your own numbers, open the live OT Integration Readiness Score calculator, set ot integration severity score to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.