Rare Earth Magnet & Motor Materials worked example

Magnetization Capacity at 99% expected magnetizer uptime: a worked example

Push expected magnetizer uptime up to 99% and the picture changes. This example computes every intermediate figure at that operating point. Use it when magnetization capacity in rare earth magnet and motor materials is being asked to take on more work and you need to know if there is room.

The inputs for this scenario

  • Magnets magnetized per pulse cycle: 4 units / cycle (unchanged)
  • Available magnetizer pulse cycles: 480 cycles (unchanged)
  • Expected magnetizer uptime: 99 % (raised for this scenario; the documented default is 90)
  • Expected magnetization first-pass yield: 97 % (unchanged)

Working through the calculation

  • Applying the documented formula (Gross magnetization capacity = magnetization capacity output per cycle × available magnetization capacity cycles) to the inputs above produces each figure below.
  • At this operating point the engine returns 1,844 units for good magnetization capacity, the number this scenario is built around.
  • At this operating point the engine returns 1,920 units for gross magnetization capacity.
  • At this operating point the engine returns 19.2 units for magnetization capacity downtime loss.
  • At this operating point the engine returns 57.02 units for magnetization capacity yield loss.

How this compares with the baseline

  • Against the tool's baseline example, where expected magnetizer uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
  • It multiplies output per cycle by available cycles for gross capacity, then derates by uptime and first-pass yield to give good units. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.

Results at a glance

  • Good magnetization capacity: 1,844 units (headline result)
  • Gross magnetization capacity: 1,920 units
  • Magnetization capacity downtime loss: 19.2 units
  • Magnetization capacity yield loss: 57.02 units

Run it with your numbers

  • Every input above is editable in the live Magnetization Capacity calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.