Rare Earth Magnet & Motor Materials worked example

Magnetization Capacity at 65% expected magnetizer uptime: a worked example

This worked example runs the magnetization capacity numbers for a tougher week than the baseline: 65% expected magnetizer uptime instead of the typical 90%. Estimate magnetization capacity for rare earth magnet and motor materials using production-ready inputs so teams can confirm whether capacity can cover demand before committing the schedule.

The inputs for this scenario

  • Magnets magnetized per pulse cycle: 4 units / cycle (held at the documented default)
  • Available magnetizer pulse cycles: 480 cycles (held at the documented default)
  • Expected magnetizer uptime: 65 % (the input this scenario stresses; the baseline uses 90)
  • Expected magnetization first-pass yield: 97 % (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Gross magnetization capacity = magnetization capacity output per cycle × available magnetization capacity cycles.
  • Good magnetization capacity works out to 1,211 units at these inputs, and this is the headline figure for the scenario.
  • Gross magnetization capacity works out to 1,920 units at these inputs.
  • Magnetization capacity downtime loss works out to 672 units at these inputs.
  • Magnetization capacity yield loss works out to 37.44 units at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where expected magnetizer uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 27.78% below the baseline at 1,211 units.
  • Use it for shift or line capacity planning, quoting delivery dates, or deciding whether adding fixtures or cutting downtime buys more throughput. A result at this level usually justifies acting on the stressed input before touching anything else, because every other figure in the table is downstream of it.

Results at a glance

  • Good magnetization capacity: 1,211 units (headline result)
  • Gross magnetization capacity: 1,920 units
  • Magnetization capacity downtime loss: 672 units
  • Magnetization capacity yield loss: 37.44 units