Robotic End-of-Arm Tooling worked example

Design Review Hours at 12% setup, handling, and delay allowance: a worked example

What does the result look like when setup, handling, and delay allowance reaches 12%? The full calculation is worked below with real intermediate numbers. Use it when design review hours in robotic end-of-arm tooling is changing rate or allowance and you want to see the impact.

The inputs for this scenario

  • Design review items to assess: 120 units (unchanged)
  • Design review throughput rate: 12 units / min (unchanged)
  • Setup, handling, and delay allowance: 12 % (raised for this scenario; the documented default is 10)

Working through the calculation

  • Applying the documented formula (Base design review hours time = design review hours workload ÷ design review hours completion rate) to the inputs above produces each figure below.
  • At this operating point the engine returns 11.2 hr for required design review hours time, the number this scenario is built around.
  • At this operating point the engine returns 10 hr for base design review hours time.
  • At this operating point the engine returns 12 % for design review hours allowance applied.
  • At this operating point the engine returns 12 pieces / min for design review hours completion rate.

How this compares with the baseline

  • Against the tool's baseline example, where setup, handling, and delay allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
  • A figure at this level is achievable when setup, handling, and delay allowance is genuinely sustained, not just peaked for a shift. It treats review throughput as constant, so a package with a few unusually complex items — a novel multi-sensor tool changer — will take longer than the average rate predicts.

Results at a glance

  • Required design review hours time: 11.2 hr (headline result)
  • Base design review hours time: 10 hr
  • Design review hours allowance applied: 12 %
  • Design review hours completion rate: 12 pieces / min

Run it with your numbers

  • Every input above is editable in the live Design Review Hours calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.