Robotic End-of-Arm Tooling worked example

Design Review Hours at 7.2% setup, handling, and delay allowance: a worked example

Here is what the math looks like when conditions slip. We hold every other input steady and drop setup, handling, and delay allowance to 7.2%, then walk the calculation through step by step. Estimate design review hours for robotic end-of-arm tooling using production-ready inputs so teams can plan labor hours, schedule the work, or check whether the job fits the available shift time.

The inputs for this scenario

  • Design review items to assess: 120 units (held at the documented default)
  • Design review throughput rate: 12 units / min (held at the documented default)
  • Setup, handling, and delay allowance: 7.2 % (the input this scenario stresses; the baseline uses 10)

Working through the calculation

  • The calculation starts from the formula this tool documents: Base design review hours time = design review hours workload ÷ design review hours completion rate.
  • Required design review hours time works out to 10.72 hr at these inputs, and this is the headline figure for the scenario.
  • Base design review hours time works out to 10 hr at these inputs.
  • Design review hours allowance applied works out to 7.2 % at these inputs.
  • Design review hours completion rate works out to 12 pieces / min at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where setup, handling, and delay allowance sits at 10% and the headline result is 11 hr, this scenario comes in 2.55% below the baseline at 10.72 hr.
  • The practical read: the gap between this scenario and the baseline is entirely attributable to setup, handling, and delay allowance, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. It treats review throughput as constant, so a package with a few unusually complex items — a novel multi-sensor tool changer — will take longer than the average rate predicts.

Results at a glance

  • Required design review hours time: 10.72 hr (headline result)
  • Base design review hours time: 10 hr
  • Design review hours allowance applied: 7.2 %
  • Design review hours completion rate: 12 pieces / min

Run it with your numbers

  • To rerun this with your own numbers, open the live Design Review Hours calculator, set setup, handling, and delay allowance to your actual value, and adjust the remaining inputs to match your operation.

Last reviewed 2026-05-12.