Rubber, Tires, Foam & Elastomer Manufacturing worked example
Tire Scrap Value at 81% material recovery yield: a worked example
Push material recovery yield up to 81% and the picture changes. This example computes every intermediate figure at that operating point. A retreader or new-tire plant uses this to value defective tire output against disposal cost when sizing a recycling credit.
The inputs for this scenario
- Scrap tires generated: 400 tires (unchanged)
- Recovered material value per tire: 3.5 $/tire (unchanged)
- Material recovery yield: 81 % (raised for this scenario; the documented default is 70)
- Hauling and disposal fee: 250 $ (unchanged)
Working through the calculation
- Applying the documented formula (Total scrap value = scrap tires x recovered value/tire x recovery yield% + hauling fee) to the inputs above produces each figure below.
- At this operating point the engine returns 1,384 $ for total tire scrap value cost, the number this scenario is built around.
- At this operating point the engine returns 3.46 $ / piece for tire scrap value cost per unit.
- At this operating point the engine returns 1,134 $ for variable tire scrap value cost.
- At this operating point the engine returns 250 $ for fixed tire scrap value adder.
How this compares with the baseline
- Against the tool's baseline example, where material recovery yield sits at 70% and the headline result is 1,230 $, this scenario comes in 12.52% above the baseline at 1,384 $.
- It computes the total value of a scrap tire stream by applying recovery yield to per-tire value and adding the fixed hauling and disposal fee, then divides by tire count. The value of this scenario is the size of the gap it exposes: that gap, priced out over a year, is the budget you can justify spending to close it.
Results at a glance
- Total tire scrap value cost: 1,384 $ (headline result)
- Tire scrap value cost per unit: 3.46 $ / piece
- Variable tire scrap value cost: 1,134 $
- Fixed tire scrap value adder: 250 $
Run it with your numbers
- Every input above is editable in the live Tire Scrap Value calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.