Semiconductor Fab Equipment Manufacturing worked example

Acceptance Throughput at 99% tool acceptance-test uptime: a worked example

This scenario runs the acceptance throughput calculation on the strong side: 99% tool acceptance-test uptime, with every other input held at its documented default. Use it when acceptance throughput in semiconductor fab equipment manufacturing is being asked to take on more work and you need to know if there is room.

The inputs for this scenario

  • Wafers accepted per acceptance-test cycle: 4 units / cycle (unchanged)
  • Acceptance-test cycles available per shift: 480 cycles (unchanged)
  • Tool acceptance-test uptime: 99 % (raised for this scenario; the documented default is 90)
  • Acceptance-test first-pass yield: 97 % (unchanged)

Working through the calculation

  • Applying the documented formula (Gross acceptance throughput capacity = acceptance throughput output per cycle × available acceptance throughput cycles) to the inputs above produces each figure below.
  • At this operating point the engine returns 1,844 units for good acceptance throughput capacity, the number this scenario is built around.
  • At this operating point the engine returns 1,920 units for gross acceptance throughput capacity.
  • At this operating point the engine returns 19.2 units for acceptance throughput downtime loss.
  • At this operating point the engine returns 57.02 units for acceptance throughput yield loss.

How this compares with the baseline

  • Against the tool's baseline example, where tool acceptance-test uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 10% above the baseline at 1,844 units.
  • Use it during tool acceptance runs, marathon qualification, or capacity modeling when you need to translate a raw cycle rate into wafers the tool will genuinely accept and pass. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.

Results at a glance

  • Good acceptance throughput capacity: 1,844 units (headline result)
  • Gross acceptance throughput capacity: 1,920 units
  • Acceptance throughput downtime loss: 19.2 units
  • Acceptance throughput yield loss: 57.02 units

Run it with your numbers

  • Every input above is editable in the live Acceptance Throughput calculator, which recalculates instantly and can be shared with the inputs intact.

Last reviewed 2026-05-12.