Signage, Displays & Architectural Graphics worked example
Substrate Yield at 99% target good-sheet rate: a worked example in signage, displays & architectural graphics
This scenario runs the substrate yield calculation on the strong side: 99% target good-sheet rate, with every other input held at its documented default. Use it when substrate yield in signage, displays and architectural graphics needs a clean rate and gap-to-target you can put on a tier board.
The inputs for this scenario
- Rejected or scrapped sheets: 8 units (unchanged)
- Total sheets processed: 250 units (unchanged)
- Target good-sheet rate: 99 % (raised for this scenario; the documented default is 95)
Working through the calculation
- Applying the documented formula (Substrate Yield rate = affected amount รท total amount) to the inputs above produces each figure below.
- At this operating point the engine returns 3.2 % for rate, the number this scenario is built around.
- At this operating point the engine returns 95.8 points for gap to target.
- At this operating point the engine returns 8 count for affected count.
- At this operating point the engine returns 250 count for total count.
How this compares with the baseline
- Against the tool's baseline example, where target good-sheet rate sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
- Use it after a run or shift to gauge material scrap, or during process changes to see whether a new setup improves substrate survival. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Rate: 3.2 % (headline result)
- Gap to target: 95.8 points
- Affected count: 8 count
- Total count: 250 count
Run it with your numbers
- Every input above is editable in the live Substrate Yield calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.