S&OP, Demand Planning & Forecasting worked example
S&OP Meeting Load at 12% setup, discussion and delay allowance: a worked example
This scenario runs the s&op meeting load calculation on the strong side: 12% setup, discussion and delay allowance, with every other input held at its documented default. Use it when s&op meeting load in s and op, demand planning and forecasting needs a defensible run time before a quote goes out.
The inputs for this scenario
- S&OP prep items to work through (agenda/exceptions): 120 units (unchanged)
- Items cleared per minute of working time: 12 units / min (unchanged)
- Setup, discussion and delay allowance: 12 % (raised for this scenario; the documented default is 10)
Working through the calculation
- Applying the documented formula (Base s&op meeting load time = s&op meeting load workload รท s&op meeting load completion rate) to the inputs above produces each figure below.
- At this operating point the engine returns 11.2 hr for required s&op meeting load time, the number this scenario is built around.
- At this operating point the engine returns 10 hr for base s&op meeting load time.
- At this operating point the engine returns 12 % for s&op meeting load allowance applied.
- At this operating point the engine returns 12 pieces / min for s&op meeting load completion rate.
How this compares with the baseline
- Against the tool's baseline example, where setup, discussion and delay allowance sits at 10% and the headline result is 11 hr, this scenario comes in 1.82% above the baseline at 11.2 hr.
- Use it when scoping the effort for an S&OP cycle step - demand review prep, exception clearing, or reconciliation - so you can plan staffing and calendar time realistically. Treat this as a target state: the delta against the baseline quantifies what the improvement is worth before you commit to chasing it.
Results at a glance
- Required s&op meeting load time: 11.2 hr (headline result)
- Base s&op meeting load time: 10 hr
- S&op meeting load allowance applied: 12 %
- S&op meeting load completion rate: 12 pieces / min
Run it with your numbers
- Every input above is editable in the live S&OP Meeting Load calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.