Sterilization & Sterile Barrier Manufacturing worked example
Inspection Bottleneck with escape severity if a defect passes inspection of 15 score: a worked example in sterilization & sterile barrier manufacturing
What does the result look like when escape severity if a defect passes inspection reaches 15 score? The full calculation is worked below with real intermediate numbers. Use it when inspection bottleneck in sterilization and sterile barrier manufacturing needs a defensible ranking against other sterilization and sterile barrier manufacturing risks for the next review.
The inputs for this scenario
- Escape severity if a defect passes inspection: 15 score (raised for this scenario; the documented default is 6)
- Likelihood of the defect occurring: 4 score (unchanged)
- Inspection detectability of the defect: 3 score (unchanged)
Working through the calculation
- Applying the documented formula (Inspection bottleneck risk score = inspection bottleneck severity score × inspection bottleneck occurrence score × inspection bottleneck detection score) to the inputs above produces each figure below.
- At this operating point the engine returns 8.15 score for inspection bottleneck risk score, the number this scenario is built around.
- At this operating point the engine returns 15 score for inspection bottleneck severity score.
- At this operating point the engine returns 4 score for inspection bottleneck occurrence score.
- At this operating point the engine returns 3 score for inspection bottleneck detection score.
How this compares with the baseline
- Against the tool's baseline example, where escape severity if a defect passes inspection sits at 6 score and the headline result is 4.55 score, this scenario comes in 79.12% above the baseline at 8.15 score.
- A figure at this level is achievable when escape severity if a defect passes inspection is genuinely sustained, not just peaked for a shift. Scores are subjective ordinal ratings, so a risk number is only meaningful when the same scale and rating guide are used across all inspection steps compared.
Results at a glance
- Inspection bottleneck risk score: 8.15 score (headline result)
- Inspection bottleneck severity score: 15 score
- Inspection bottleneck occurrence score: 4 score
- Inspection bottleneck detection score: 3 score
Run it with your numbers
- Every input above is editable in the live Inspection Bottleneck calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.