Sterilization & Sterile Barrier Manufacturing worked example
Inspection Bottleneck with escape severity if a defect passes inspection of 3 score: a worked example in sterilization & sterile barrier manufacturing
Here is what the math looks like when conditions slip. We hold every other input steady and drop escape severity if a defect passes inspection to 3 score, then walk the calculation through step by step. Estimate inspection bottleneck for sterilization and sterile barrier manufacturing using production-ready inputs so teams can rank risks and decide which issue needs containment, controls, or escalation first.
The inputs for this scenario
- Escape severity if a defect passes inspection: 3 score (the input this scenario stresses; the baseline uses 6)
- Likelihood of the defect occurring: 4 score (held at the documented default)
- Inspection detectability of the defect: 3 score (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Inspection bottleneck risk score = inspection bottleneck severity score × inspection bottleneck occurrence score × inspection bottleneck detection score.
- Inspection bottleneck risk score works out to 3.35 score at these inputs, and this is the headline figure for the scenario.
- Inspection bottleneck severity score works out to 3 score at these inputs.
- Inspection bottleneck occurrence score works out to 4 score at these inputs.
- Inspection bottleneck detection score works out to 3 score at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where escape severity if a defect passes inspection sits at 6 score and the headline result is 4.55 score, this scenario comes in 26.37% below the baseline at 3.35 score.
- The practical read: the gap between this scenario and the baseline is entirely attributable to escape severity if a defect passes inspection, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. Scores are subjective ordinal ratings, so a risk number is only meaningful when the same scale and rating guide are used across all inspection steps compared.
Results at a glance
- Inspection bottleneck risk score: 3.35 score (headline result)
- Inspection bottleneck severity score: 3 score
- Inspection bottleneck occurrence score: 4 score
- Inspection bottleneck detection score: 3 score
Run it with your numbers
- To rerun this with your own numbers, open the live Inspection Bottleneck calculator, set escape severity if a defect passes inspection to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.