Sustainable Packaging & EPR Compliance worked example
Packaging Recycled Content at 99% recycled-content target: a worked example
What does the result look like when recycled-content target reaches 99%? The full calculation is worked below with real intermediate numbers. Use it when packaging recycled content in sustainable packaging and epr compliance needs a clean rate and gap-to-target you can put on a tier board.
The inputs for this scenario
- Recycled-content units in sample: 8 count (unchanged)
- Total packaging units sampled: 250 count (unchanged)
- Recycled-content target: 99 % (raised for this scenario; the documented default is 95)
Working through the calculation
- Applying the documented formula (Packaging recycled content rate = packaging recycled content count ÷ total packaging recycled content population × 100) to the inputs above produces each figure below.
- At this operating point the engine returns 3.2 % for packaging recycled content rate, the number this scenario is built around.
- At this operating point the engine returns 95.8 points for packaging recycled content gap to target.
- At this operating point the engine returns 8 count for packaging recycled content count.
- At this operating point the engine returns 250 count for total packaging recycled content population.
How this compares with the baseline
- Against the tool's baseline example, where recycled-content target sits at 95% and the headline result is 3.2 %, this scenario lands almost exactly on the baseline at 3.2 %.
- A figure at this level is achievable when recycled-content target is genuinely sustained, not just peaked for a shift. A unit count treats every item equally; if items differ in weight, a mass-based recycled-content calculation is what regulators usually require, and this count-based rate will diverge from it.
Results at a glance
- Packaging recycled content rate: 3.2 % (headline result)
- Packaging recycled content gap to target: 95.8 points
- Packaging recycled content count: 8 count
- Total packaging recycled content population: 250 count
Run it with your numbers
- Every input above is editable in the live Packaging Recycled Content calculator, which recalculates instantly and can be shared with the inputs intact.
Last reviewed 2026-05-12.