Wire, Cable & Conductor Manufacturing worked example

Spool Capacity at 65% line uptime: a worked example

Here is what the math looks like when conditions slip. We hold every other input steady and drop line uptime to 65%, then walk the calculation through step by step. Spool capacity here is the good, shippable length a winding or take-up line can produce over a planning period, after uptime and yield losses.

The inputs for this scenario

  • Length wound per take-up cycle: 4 units / cycle (held at the documented default)
  • Take-up cycles available in the period: 480 cycles (held at the documented default)
  • Line uptime: 65 % (the input this scenario stresses; the baseline uses 90)
  • Good-length yield: 97 % (held at the documented default)

Working through the calculation

  • The calculation starts from the formula this tool documents: Gross spool capacity capacity = units per cycle × available cycles.
  • Good output capacity works out to 1,211 units at these inputs, and this is the headline figure for the scenario.
  • Gross capacity works out to 1,920 units at these inputs.
  • Uptime loss works out to 672 units at these inputs.
  • Yield loss works out to 37.44 units at these inputs.

How this compares with the baseline

  • Against the tool's baseline example, where line uptime sits at 90% and the headline result is 1,676 units, this scenario comes in 27.78% below the baseline at 1,211 units.
  • The practical read: the gap between this scenario and the baseline is entirely attributable to line uptime, so recovering it is worth quantifying in dollars before considering equipment or staffing changes. It treats uptime and yield as flat averages; a run plagued by clustered breaks or a single bad batch can deviate from the modeled loss split.

Results at a glance

  • Good output capacity: 1,211 units (headline result)
  • Gross capacity: 1,920 units
  • Uptime loss: 672 units
  • Yield loss: 37.44 units