Hydrogen Electrolyzer & Fuel Cell Manufacturing worked example
Supplier Shortage Risk with impact severity if this supplier misses of 4 score: a worked example in hydrogen electrolyzer & fuel cell manufacturing
Suppose impact severity if this supplier misses falls to 4 score. This page works the full calculation at that level so you can see exactly which result moves and by how much. Score the shortage risk of a critical hydrogen stack supplier (membrane, catalyst, bipolar plate, gas diffusion media, gasket) by weighting impact severity, the likelihood of an on-time miss, and the detection lead time before the line goes down.
The inputs for this scenario
- Impact severity if this supplier misses: 4 score (the input this scenario stresses; the baseline uses 8)
- Occurrence likelihood (on-time miss frequency): 4 score (held at the documented default)
- Detection lead time before the line stops: 5 score (held at the documented default)
Working through the calculation
- The calculation starts from the formula this tool documents: Weighted shortage risk score = severity × 0.40 + occurrence × 0.35 + detection × 0.25.
- Weighted shortage risk score works out to 4.25 score at these inputs, and this is the headline figure for the scenario.
- Impact severity works out to 4 score at these inputs.
- On-time miss likelihood works out to 4 score at these inputs.
- Detection lead time works out to 5 score at these inputs.
How this compares with the baseline
- Against the tool's baseline example, where impact severity if this supplier misses sits at 8 score and the headline result is 5.85 score, this scenario comes in 27.35% below the baseline at 4.25 score.
- It computes one weighted risk score from severity (40%), occurrence (35%), and detection (25%) so suppliers can be ranked on a common scale. When the numbers land here, the stressed input is the lever to work; the walkthrough above shows exactly how much each output recovers as it climbs back toward the baseline.
Results at a glance
- Weighted shortage risk score: 4.25 score (headline result)
- Impact severity: 4 score
- On-time miss likelihood: 4 score
- Detection lead time: 5 score
Run it with your numbers
- To rerun this with your own numbers, open the live Supplier Shortage Risk calculator, set impact severity if this supplier misses to your actual value, and adjust the remaining inputs to match your operation.
Last reviewed 2026-05-12.