AI & Digital Manufacturing Analytics calculator
AI Training Data Balance Calculator
Check defect-class representation in a repeated lot-and-run sampling plan. Enter total and defect samples per run plus your training-plan target.
What this calculator does
- Calculate planned defect-class representation across production lots and repeated sampling runs.
Formula used
- Total samples = lots × runs per lot × samples per run
- Defect samples = lots × runs per lot × defect samples per run
- Defect share (%) = defect samples per run ÷ samples per run × 100
- Other samples = total samples − defect samples
- Share gap = target defect share − planned defect share
Inputs explained
- Production Lots Represented: Distinct lots included in the planned capture schedule.
- Runs per Lot: Capture runs scheduled for every included lot.
- Labeled Samples per Run: Unique labeled samples planned in every run.
- Defect Samples per Run: Confirmed defect-class samples allocated within each run.
- Target Defect-Class Share: Minimum defect representation specified for this training plan.
How to use the result
- Best suited to defect collection planning, lot-diverse training allocation.
- The plan does not guarantee defects will be available in each run. Balanced counts do not establish independent or representative training examples.
Common questions
- Why does adding lots leave the percentage unchanged? Each added run has the same class allocation, so both defect and total counts increase proportionally.
- Must defect samples make up half the dataset? No. Set representation for your learning objective and validate the choice; there is no universal best class ratio.
- Can this handle different counts in each run? Not directly. Group runs with identical allocations or calculate from the actual class totals separately.
- Should the test set use the training balance? The test set should represent the intended evaluation population; training resampling should not silently change that population.
Last reviewed 2026-10-23.