MFG Calcs
How every number on this site is built and verified.
How MFG Calcs builds and verifies its numbers: formulas tested in an automated suite, and agency data that is dated, signed, revision-tracked, and graded.
About this page
- Every calculator on MFG Calcs goes through the same six steps: research the formula from recognized references, implement it in typed code, cover it with automated tests, validate the page content, review the writing, and correct promptly when users report issues.
- The automated test suite pins known inputs to known correct outputs, so any edit that changes a result fails the build before it can reach the site. Accuracy is enforced by the build, not by hoping someone double-checks.
- Guides and benchmarks follow an editorial standard of numbers over adjectives: every claim carries a figure, a method, or a concrete example, with assumptions written down on the page.
Last reviewed 2026-10-01.