MFG Calcs
Send a calculator request, bug, or feature idea.
Contact MFG Calcs with calculator requests, bug reports, feedback, or feature ideas.
About this page
- Use this page to request a calculator we have not built yet, report a formula error, suggest a correction, or ask about the library. Calculator requests and error reports are read by the team that builds the tools.
- When we confirm a reported error, we fix the formula and add an automated test that locks in the correct behavior so the same mistake cannot come back. Corrections are treated as a normal part of maintaining a reference.
Related manufacturing topics
- calculator request
- manufacturing calculator feedback
Last reviewed 2026-07-13.