EV & Battery Manufacturing calculator

Electrode Coating Automation Payback Calculator

Find how long a coater upgrade takes to pay for itself and what it returns over your horizon. You need the investment, the yearly savings, the yearly support cost and the horizon.

What this calculator does

  • Payback period and horizon return of an electrode coating upgrade from its investment, yearly savings and yearly support cost.

Formula used

  • Net annual coating savings ($/yr) = annual coating line savings − annual coating support cost
  • Coating project payback period (yr) = coating project investment ÷ net annual coating savings
  • Net value over the horizon ($) = net annual savings × planning horizon − coating project investment
  • Return over the horizon (%) = net value over the horizon ÷ coating project investment × 100

Inputs explained

  • Electrode Coating Project Investment: Coater, drying and controls upgrade paid up front.
  • Annual Coating Line Savings: Yearly savings in scrap, speed and labor on the coater.
  • Annual Coating Support Cost: Yearly maintenance, spares and process engineering.
  • Planning Horizon: Years over which you judge the investment.

How to use the result

  • Best suited to approving a coater upgrade, comparing two coating line proposals.
  • Does not model the qualification ramp. Ignores the coater's value after the horizon.

Current U.S. benchmarks

  • The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
  • U.S. light vehicles sell at a 15.5 million annual rate (BEA, Oct 2026), down 0.9% from a year earlier, the volume signal for automotive supply chains.
  • Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
  • The U.S. has 11,691 transportation equipment establishments employing about 1,682,910 workers (Census County Business Patterns, 2023).

Common questions

  • What savings count? Coating scrap avoided, valued at the cell's cost where it would have been scrapped, line speed gained and operator hours redeployed.
  • What is the support cost? Maintenance contracts, spare slot dies and rollers, and the process engineering time the new coater needs every year.
  • Why make the horizon an input? Net value and return depend on how many years of savings you count. V1 fixed five years; your capital policy may say otherwise.
  • What if support cost exceeds the savings? The project never pays back on those figures, so the calculator stops with a blocking issue rather than printing a negative payback.

Last reviewed 2026-10-29.