Blow Molding & Hollow Plastic Products calculator

Bottle Weight Variation Calculator

Separate bottle-weight spread from an off-target average. Enter the sample mean, sample standard deviation, nominal weight and your relative-variation ceiling.

What this calculator does

  • Measure relative bottle-weight variation and distinguish it from bias against nominal weight.

Formula used

  • Weight variation = sample standard deviation ÷ sample mean × 100
  • Mean bias = sample mean − nominal weight
  • Variation margin = maximum variation − weight variation
  • Mean bias percent = mean bias ÷ nominal weight × 100

Inputs explained

  • Sample Mean Bottle Weight: Mean of the same conditioned bottle sample used for deviation.
  • Sample Weight Standard Deviation: Sample standard deviation from those individual bottle weights.
  • Nominal Bottle Weight: Specified target weight for the trimmed container.
  • Maximum Weight Variation: Maximum relative standard deviation on your control plan.

How to use the result

  • Best suited to parison weight stability review, cavity weight comparison.
  • Does not infer defect probability, capability or confidence limits.

Current U.S. benchmarks

  • The producer price index for plastic resins and materials stands at 283.88 (BLS, Oct 2026), up 9.5% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The U.S. has 9,635 plastics product manufacturing establishments employing about 677,302 workers (Census County Business Patterns, 2023).

Common questions

  • Can I enter the highest-minus-lowest weight as standard deviation? No. A range and a standard deviation are different statistics. Calculate sample standard deviation from the individual measured weights.
  • Does a low variation mean bottles meet weight specifications? No. A tightly grouped sample can be off target. Check the mean bias and your actual individual weight limits.
  • Should sample weights include flash? Use consistently trimmed container weights when assessing finished bottles. Include flash only for a separate, explicitly defined parison study.
  • Does the sample count need to be entered here? No. It is already part of the sample standard deviation calculation. Keep the original measurements and count when assessing representativeness.

Last reviewed 2026-10-13.