Coffee, Tea, Roasting & Dry Goods Processing calculator
Flavoring Usage Calculator
Work out the flavor the week's flavored batches will use and whether stock covers them. You need the batch weight, the dose by weight, the batches planned and the flavor on hand.
What this calculator does
- Flavor the planned flavored-coffee batches need at your dose, and how many batches the flavor on hand covers.
Formula used
- Flavor per batch = flavored batch weight × flavor dose ÷ 100
- Flavor needed for planned batches = flavor per batch × flavored batches planned
- Batches the flavor on hand covers = flavor on hand ÷ flavor per batch, rounded down; flavor left = on hand − needed
Inputs explained
- Flavored Batch Weight: Roasted coffee per flavoring batch, from the batch sheet.
- Flavor Dose: Dose from the flavor supplier's sheet; Apex's typical rate is 3.00%.
- Flavored Batches Planned: Flavored batches on the schedule.
- Flavor on Hand: Flavor in stock, from inventory.
How to use the result
- Best suited to planning a week of flavored coffee, ordering flavor before a seasonal run, checking a new dose rate.
- Covers flavor only; carrier, labor and the separate flavoring room are outside it.
Common questions
- What dose should I use? The flavor supplier's rate for that flavor. Apex Flavors gives a typical usage rate of 3.00% by weight, weighed on a scale accurate to tenths of a gram.
- Where should flavoring happen? Apex advises flavoring in a room separate from roasting and packaging, to keep flavor off unflavored coffee.
- Why count batches covered? So you know which batch on the schedule would run short, and can order flavor before it.
- What do the defaults show? At these defaults, 80 lb batches at 3% take 2.4 lb each; 12 batches need 28.8 lb, and the 30 lb on hand covers all 12.
Last reviewed 2026-11-12.