Commercial Kitchen Equipment calculator

Compliance Documentation Risk Score Calculator

Rank which documentation gaps need action before shipment. Rate impact, likelihood and how likely the pre-shipment audit is to miss a gap, each 1 to 10, then set your threshold.

What this calculator does

  • Risk priority number for a compliance documentation gap from impact, likelihood and pre-shipment audit detection ratings, against your action threshold.

Formula used

  • Risk priority number = documentation defect impact severity × documentation gap likelihood × pre-shipment audit detection weakness, each rated 1 to 10
  • RPN over threshold = risk priority number − action threshold
  • Severity × likelihood = impact severity × gap likelihood
  • Highest rating = the largest of the three ratings

Inputs explained

  • Documentation Defect Impact Severity: How badly the gap would hold up shipment, 1 to 10.
  • Documentation Gap Likelihood: How likely the gap is to occur, 1 to 10.
  • Pre-Shipment Audit Detection Weakness: How likely the audit is to miss the gap, 1 to 10.
  • Action Threshold: The RPN at which your team acts, from your risk procedure.

How to use the result

  • Best suited to reviewing documentation before shipment, ranking compliance gaps for a new model, deciding where to tighten the pre-shipment audit.
  • The ratings are ordinal, so two gaps with the same RPN can carry very different risks; read severity alongside it.

Current U.S. benchmarks

  • Industrial natural gas averages $4.34 per Mcf (EIA, Aug 2026), down 2.9% from a year earlier, with industrial electricity at 9.64 cents per kWh. Process heating and refrigeration budgets track both.
  • Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).

Common questions

  • What kinds of gaps does this rank? Missing or out-of-date manuals, certificates, rating labels, test records and declarations that a shipment or approval needs.
  • Why multiply the ratings? That is how an FMEA risk priority number is formed. The ratings are ordinal, so read the severity rating as well as the product.
  • Where does the action threshold come from? From your own risk or compliance procedure. Set it once and use it for every documentation topic.
  • How do I rate detection weakness? A 10 means the pre-shipment audit would almost certainly miss the gap; a 1 means it would almost certainly catch it.

Last reviewed 2026-11-12.