Commercial Kitchen Equipment calculator
Warranty Reserve Calculator
Work out the reserve your units still under warranty need. You need the units under warranty, claim rate per 100 units, share of the term left, average cost per claim, program costs and the reserve booked.
What this calculator does
- Warranty reserve the kitchen equipment still under warranty needs, from the claim rate, the term remaining and cost per claim, against the reserve booked.
Formula used
- Expected claims still to come = units under warranty × claim rate per 100 units ÷ 100 × share of the term remaining ÷ 100
- Expected claim cost = expected claims × average cost per claim
- Warranty reserve requirement = expected claim cost + service bulletin, training and admin cost
- Reserve shortfall = requirement − reserve on the books; reserve per unit = requirement ÷ units under warranty
Inputs explained
- Units Under Warranty: Units still inside their warranty term, from sales records.
- Claim Rate per 100 Units Over the Term: Claims per 100 units over a full term, from claims history.
- Share of the Term Remaining: Average share of the warranty term these units have left.
- Average Cost per Claim: Parts, labor and travel per paid claim, from service agent invoices.
- Service Bulletin, Training and Admin Cost: Planned cost of service bulletins, agent training and claim admin.
- Reserve on the Books: The warranty reserve balance in your accounts now.
How to use the result
- Best suited to checking the warranty reserve at month end, setting a reserve for a new product line, reviewing the reserve after a service bulletin.
- Does not cover a recall or a field fix across every unit; plan those separately.
Current U.S. benchmarks
- Industrial natural gas averages $4.34 per Mcf (EIA, Aug 2026), down 2.9% from a year earlier, with industrial electricity at 9.64 cents per kWh. Process heating and refrigeration budgets track both.
- Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).
Common questions
- Where does the claim rate come from? From claims history: claims paid over a full warranty term per 100 units sold, for this product or the closest one.
- Why use the share of the term remaining? Units part way through their term have only that share of their expected claims still to come.
- What goes in the program cost? Planned spending tied to the warranty that is not a single claim, such as a service bulletin, agent training or claim handling.
- Is this the reserve my accounts must show? It is an expected value to compare with the books. Your accounting policy and auditors decide the provision.
Last reviewed 2026-11-12.