Peak Demand Reduction Value Calculator

Estimate peak demand reduction value from its documented billing basis.

What this calculator does

  • Estimate peak demand reduction value from its documented billing basis.

Formula used

  • Variable amount = entered quantity × unit amount × applicable share / 100
  • Total amount = variable amount + separate fixed amount
  • Amount per entered quantity = total / positive entered quantity

Inputs explained

  • Coincident Peak Reduction: Enter potential coincident billed-demand reduction before the persistence adjustment.
  • Demand Charge Rate: Enter avoidable demand charges per billed kW for the evaluation period.
  • Savings Persistence: Enter sustained billed-demand reduction share; use 100% for already-adjusted demand reduction.
  • Earned Program Incentive: Enter earned program incentives for this same billing period.

How to use the result

  • Best suited to peak demand reduction value review, lower and higher savings persistence.
  • The linear arithmetic cannot infer eligibility, ratchets, minimum charges or nonlinear tariff provisions.

Current U.S. benchmarks

  • Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.

Common questions

  • Does lowering any equipment peak reduce the bill? Only when it reduces the demand used by the applicable utility charge, including coincidence and ratchet rules.
  • When should persistence be 100%? When the entered peak reduction already reflects demonstrated sustained billing performance.
  • Can an unearned demand-response incentive be counted? Use only an earned or explicitly supported scenario amount for the same reporting period.
  • Does the result include energy-charge savings? No. It values the entered demand reduction and incentive; price any kWh saving separately without overlap.