Environmental Compliance, Waste & Water Management calculator

VOC Emissions Estimate Calculator

Estimate the VOC a controlled process emits in a period and compare it with your limit. You need the uncontrolled rate, the hours run and both efficiencies from your last performance test.

What this calculator does

  • VOC emitted in a period from the uncontrolled rate, operating hours, capture efficiency and control device efficiency, checked against your permit limit.

Formula used

  • Uncontrolled VOC = uncontrolled VOC rate × operating hours
  • Overall control efficiency = capture efficiency × control device efficiency ÷ 100 (40 CFR 63.3370, Equation 15)
  • VOC emitted = uncontrolled VOC × (1 − overall control efficiency ÷ 100), the AP 42 controlled emissions form
  • Uncaptured VOC = uncontrolled VOC × (1 − capture efficiency ÷ 100); VOC past the control device = VOC emitted − uncaptured VOC
  • Margin to the limit = emission limit for the period − VOC emitted

Inputs explained

  • Uncontrolled VOC Rate: VOC generated per hour before capture, from mass balance or emission factors.
  • Operating Hours: Hours the process ran in the period, from production logs.
  • Capture Efficiency: Share of VOC the enclosure sends to the control device, from testing.
  • Control Device Efficiency: Destruction or removal efficiency from the oxidizer's performance test.
  • Emission Limit for the Period: Your permit's VOC limit converted to kilograms for the same period.

How to use the result

  • Best suited to monthly VOC report for a coating line, comparing better capture with a new oxidizer, checking a permit limit before a production push.
  • Does not convert to tons per year or check major source thresholds; the air permit throughput calculator covers annual tons. Hours with the control device down need their own run at 0% control efficiency.

Common questions

  • Why is overall control lower than my oxidizer's efficiency? Because only captured VOC reaches the oxidizer. Overall control is capture times control device efficiency, so 85% capture and 98% destruction give 83.3% overall, and the uncaptured 15% escapes untreated.
  • Where does the uncontrolled VOC rate come from? From a material balance of the VOC in the coatings, inks and solvents used per hour. Or use an emission factor times the activity rate, as AP 42 describes, on your permit's basis.
  • Is it better to improve capture or destruction? Compare uncaptured VOC with the VOC past the control device; the larger row is the bigger lever. At 98% destruction, every capture point adds 0.98 points of overall control.
  • Can I use this for hazardous air pollutants as well? Yes, when the rate and both efficiencies are measured for the same pollutants; 40 CFR 63.3370 uses this capture times control equation for organic hazardous air pollutants.

Last reviewed 2026-11-12.