Food & Beverage Manufacturing calculator

Filling Line Throughput Calculator

Enter the good and rejected units from the run, the run time and the filler's rated speed. See the good rate, where the rest went and whether it meets the schedule.

What this calculator does

  • Good units per hour a filler actually made, with the loss split between rejects and slow running.

Formula used

  • Good units per hour = good filled units ÷ filling run time
  • Reject rate = units rejected ÷ (good filled units + units rejected) × 100
  • Speed as a share of rated = (good filled units + units rejected) ÷ filling run time ÷ filler rated speed × 100
  • Units per hour lost to rejects = units rejected ÷ filling run time; lost to slow running = rated speed − units filled per hour
  • Margin to the rate needed = good units per hour − good units per hour needed

Inputs explained

  • Good Filled Units: Units accepted by the checkweigher in the run.
  • Units Rejected at the Checkweigher: Underfilled or overfilled units kicked off the line.
  • Filling Run Time: Scheduled run time, stops included.
  • Filler Rated Speed: Nameplate or validated speed for this container.
  • Good Units per Hour Needed: Rate the schedule needs to fill the order on time.

How to use the result

  • Best suited to end-of-shift filler review, checking a fill weight change, promising a ship date for an order.
  • Does not separate stops from slow running; both show as speed loss. Rejects found after the checkweigher are not counted.

Current U.S. benchmarks

  • Industrial natural gas averages $4.34 per Mcf (EIA, Aug 2026), down 2.9% from a year earlier, with industrial electricity at 9.64 cents per kWh. Process heating and refrigeration budgets track both.
  • The U.S. has 31,130 food manufacturing establishments employing about 1,707,316 workers (Census County Business Patterns, 2023).

Common questions

  • What run time should I use? The scheduled run time from first good unit to last, stops included. Taking stops out hides the loss you are trying to find and inflates the rate.
  • Why split rejects from slow running? They have different fixes. Rejects come from fill weight control, which a checkweigher checks against set limits, while slow running comes from jams, stops and set speed.
  • What is speed as a share of rated? It is the performance part of OEE: the speed the filler ran at as a percentage of its theoretical maximal speed, counting every unit filled, good or rejected.
  • What rated speed should I enter? The nameplate or validated speed for this container and product, in units per hour. A speed proven on a smaller container overstates what the filler can do on a larger one.

Last reviewed 2026-11-12.