Grid-Scale Battery Energy Storage Systems calculator

Module Yield Calculator

Find the share of battery modules that pass formation and capacity test the first time. You need modules passing, modules entered into test and your target yield.

What this calculator does

  • Share of battery modules passing formation and capacity test the first time, compared with your target yield.

Formula used

  • Module first-pass yield (%) = modules passing first test ÷ modules entered into test × 100
  • Gap to target module yield (points) = target module yield − module first-pass yield
  • Modules failing first test = modules entered into test − modules passing first test

Inputs explained

  • Modules Passing First Test: Modules meeting every capacity and voltage limit on the first test.
  • Modules Entered Into Test: All modules started on formation and capacity test.
  • Target Module Yield: First-pass yield your plan or cost model assumes.

How to use the result

  • Best suited to weekly module test yield review, checking a new cell lot on the line.
  • Does not split failures by cause. Counts modules, not the energy they hold.

Current U.S. benchmarks

  • The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).
  • Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
  • The U.S. has 5,397 electrical equipment and appliances establishments employing about 369,437 workers (Census County Business Patterns, 2023).

Common questions

  • What does a module capacity test check? It confirms the module meets your capacity, voltage balance and insulation limits. Your test plan defines which limits count.
  • Why track first-pass yield rather than final yield? Final yield hides retests and rework. First-pass yield shows how often the build is right first time, which drives test capacity and cost.
  • What target yield should I set? The yield your cost model and capacity plan assume. The 95% default is an example only.
  • Why does the calculator stop when passing modules exceed the total? Passing modules are part of the modules tested, so they cannot be more. Check that both counts cover the same period.

Last reviewed 2026-10-28.