Furnace Downtime Cost Calculator
Estimate the economic exposure remaining after any planned production recovery. Enter downtime, contribution per productive hour, unrecovered share and additional restart cost.
What this calculator does
- Estimate unrecovered production contribution and incremental restart expense from a furnace downtime event.
Formula used
- Unrecovered production time = downtime × unrecovered output share ÷ 100
- Contribution loss = unrecovered production time × contribution per productive hour
- Total downtime exposure = contribution loss + additional restart cost
- Exposure per lost hour = total downtime exposure ÷ positive downtime
Inputs explained
- Furnace Downtime: Recorded furnace hours lost during the event.
- Contribution per Productive Hour: Lost sales less avoided variable costs per productive hour.
- Output Not Recovered Later: Share of the missed contribution not recovered by later production.
- Additional Restart Cost: Incremental restart expense outside the contribution estimate.
How to use the result
- Best suited to downtime economic review, repair priority comparison.
- This estimate does not measure total lost revenue or accounting profit. Excludes penalties, damaged inventory and recovery overtime unless included separately in restart expense.
Current U.S. benchmarks
- Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
Common questions
- Why use contribution instead of sales revenue? Variable costs avoided during downtime reduce the economic loss. Contribution deducts those avoided costs from missed sales.
- What if production is fully recovered later? Enter zero unrecovered share. Only the entered additional restart expense remains.
- Should idle payroll be added automatically? No. Add only incremental expenses not already represented in the contribution or restart estimate, avoiding double counting.
- Why is exposure per hour blank at zero downtime? Dividing by zero lost hours has no meaning. The total can still show a separately incurred restart expense.