Hose, Tubing & Fluid Conveyance Products calculator
Hose Assembly Quote Price Calculator
Price a hose assembly order from its manufacturing cost and chosen markup. Enter the quantity, unit cost, cost markup and any additional fixed tooling charge.
What this calculator does
- Apply a stated manufacturing-cost markup and an additional tooling charge to a hose assembly quote.
Formula used
- Manufactured batch cost = assemblies × manufactured unit cost
- Assembly markup dollars = manufactured cost × markup percent ÷ 100
- Quote = manufactured cost + assembly markup + additional tooling charge
- Quoted unit price = quote ÷ assembly count
- Assembly gross margin = markup ÷ (100 + markup) × 100
Inputs explained
- Assemblies in the Quote: Quoted quantity using the same manufactured unit-cost basis.
- Manufactured Cost per Assembly: Included manufacturing cost before profit markup.
- Markup on Manufacturing Cost: Chosen percentage added to manufacturing cost, not sales margin.
- Additional Fixed Tooling Charge: Separate additive customer charge, not a minimum order floor.
How to use the result
- Best suited to hose order pricing, markup and margin comparison.
- Excludes taxes, freight, discounts and unentered tooling cost.
Current U.S. benchmarks
- The U.S. has 11,391 plastics and rubber products establishments employing about 815,988 workers (Census County Business Patterns, 2023).
Common questions
- Is 30 percent markup a 30 percent margin? No. A 30 percent cost markup gives about 23.08 percent gross margin on the assembly sale before tooling.
- Does the fixed charge enforce a minimum order value? No. It is added to the marked-up assembly price. An order minimum requires a separate pricing rule.
- Why does the gross margin exclude tooling? Only the tooling revenue is entered, so its profit cannot be calculated without the associated tooling cost.
- Can quoted unit price include allocated tooling? Yes. Total quoted order value divided by quantity spreads the additional charge across the displayed unit price.
Last reviewed 2026-10-13.