Hydraulic, Pneumatic & Fluid Power Systems calculator
Hydraulic Pump Flow Calculator
Estimate a positive-displacement pump's delivered flow at one duty point. Use its displacement, actual shaft speed and volumetric efficiency at the operating pressure and oil condition.
What this calculator does
- Estimate pump delivery from displacement, speed and operating-point volumetric efficiency, then compare it with required flow.
Formula used
- Theoretical flow = displacement × shaft speed ÷ 231
- Delivered flow = theoretical flow × volumetric efficiency ÷ 100
- Internal flow deficit = theoretical flow − delivered flow
- Flow margin = delivered flow − required flow
Inputs explained
- Displacement per Revolution: Pump specification at the selected displacement setting.
- Pump Shaft Speed: Measured shaft speed at the evaluated duty point.
- Volumetric Efficiency: Operating-point test or supplier curve; actual flow divided by theoretical.
- Required Circuit Flow: Combined flow demand of actuators operating simultaneously.
How to use the result
- Best suited to checking simultaneous actuator demand, comparing pump displacement settings.
- Does not model pressure compensation, inlet starvation or shaft power. Efficiency changes with pressure, viscosity, temperature and wear.
Current U.S. benchmarks
- The U.S. has 21,668 machinery manufacturing establishments employing about 1,086,146 workers (Census County Business Patterns, 2023).
Common questions
- Where do I get volumetric efficiency? Use the supplier's flow curve or a measured flow test at the same speed and pressure. Divide actual flow by theoretical flow and multiply by 100.
- Can I use engine speed? Use pump shaft speed. A power take-off or gearbox changes speed before it reaches the pump.
- Does zero displacement mean zero flow? Yes in this model. A variable pump at zero commanded displacement produces no theoretical working flow, although its control and leakage circuits may still circulate oil.
- Why is measured delivery lower than the calculation? Check whether your efficiency value matches the hot operating condition. Wear, inadequate inlet supply and an active pressure compensator can reduce delivery.
Last reviewed 2026-10-13.