Jewelry, Watches & Precision Luxury Goods calculator

Casting Tree Utilization Calculator

Decide whether a wax tree is full enough to invest now or should wait for more patterns of the same alloy. You need the patterns mounted, the tree's proven capacity, your fill target and one flask cycle's cost.

What this calculator does

  • How full a wax tree is against its pattern capacity and your fill target, and what the empty slots add to flask cost per piece.

Formula used

  • Tree utilization = wax patterns mounted × 100 ÷ maximum tree capacity
  • Utilization gap to target = target fill rate − tree utilization (positive means below target)
  • Patterns to add = larger of 0 and (tree capacity × target fill rate ÷ 100, rounded up) − patterns mounted
  • Open slots = tree capacity − patterns mounted
  • Flask cost per piece = flask cycle cost ÷ patterns mounted; on a full tree, ÷ tree capacity

Inputs explained

  • Wax Patterns Mounted on Tree: Wax patterns sprued onto this tree, counted before investing.
  • Maximum Sprue Tree Capacity: Most patterns this flask and sprue size hold at proven spacing.
  • Target Tree Fill Rate: Your shop's minimum fill before a tree goes to investing.
  • Flask Cycle Cost: Investment, burnout energy and casting labor for one flask.

How to use the result

  • Best suited to deciding whether to cast a part-full tree today, consolidating two light trees of the same alloy.
  • Counts patterns, not metal: a few heavy signet rings can need more feed than many light earrings. Does not check spacing, sprue size or flask fit; capacity is your own proven limit.

Common questions

  • What limits how many patterns fit on one tree? Spacing. Patterns must sit far enough apart for the investment to form around each one and for metal to solidify soundly, so the sprue's size sets how many fit. Enter the capacity your flask has proven.
  • Why does flask cost per piece fall as the tree fills? Investing, burnout and casting labor are paid once per flask, whatever it holds. At the defaults the $36 cycle costs $1.71 a piece with 21 patterns and $1.50 with all 24 slots used.
  • Does lowering the target fill rate make the pieces cheaper? No. The target only sets the verdict and the patterns to add. Cost per piece depends on patterns mounted and flask cost, so a lower target passes the tree without changing its cost.
  • Should a part-full tree wait for the next batch of waxes? Wait when the extra patterns arrive before the delivery date allows. Casting now pays a full flask cycle for fewer pieces; the cost per piece rows show what waiting would save.

Last reviewed 2026-10-28.