Mass Finishing, Deburring & Polishing calculator
Compound Usage Calculator
Prepare a specified volume of liquid finishing solution. Enter the supplier-qualified concentrate percentage on a final-solution volume basis and the stock available.
What this calculator does
- Prepare a specified volume of liquid finishing solution.
Formula used
- Concentrate liters = Final solution liters × Volume percent ÷ 100
- Water liters = Final solution liters × (100 − Volume percent) ÷ 100
- Stock margin = Available concentrate − Required concentrate
Inputs explained
- Final Working Solution Volume: Total prepared solution including both water and concentrate.
- Specified Compound Volume Fraction: Supplier-qualified concentrate volume percent in the final solution.
- Available Compound Concentrate: Usable liquid concentrate available for this preparation.
How to use the result
- Best suited to compound mix preparation, concentrate stock checks.
- Powder mass, density changes and continuous concentration control are excluded.
Common questions
- Is 2% here two liters per 100 liters of water? No. It means two liters of concentrate in 100 liters of final solution, nominally with 98 liters of water.
- Can I enter a powder dose in grams per liter? No. This tool uses liquid volume fractions; use the powder manufacturer’s mass-based instruction.
- Does this set the right concentration for every metal? No. Compound selection and concentration depend on the alloy, media and finishing goal.
- Should recirculated solution be counted as fresh water? Not in a fresh mix calculation. Test and correct an existing process solution using its measured concentration and supplier procedure.
Last reviewed 2026-10-13.