Metals, Steel, Aluminum & Coil Processing calculator

Gauge Variation Calculator

Check the thickness range observed in a coil inspection. Enter both extremes, nominal gauge and the drawing's lower and upper limits.

What this calculator does

  • Measure the observed thickness range and compare sampled extremes with the drawing's lower and upper gauge limits.

Formula used

  • Observed range = maximum reading − minimum reading
  • Relative range = observed range ÷ nominal gauge × 100
  • Midpoint deviation = (first reading + second reading) ÷ 2 − nominal gauge
  • Lower margin = minimum reading − lower limit
  • Upper margin = upper limit − maximum reading

Inputs explained

  • First Extreme Reading: One observed thickness extreme from the inspection record.
  • Second Extreme Reading: The other observed thickness extreme from the same inspection.
  • Nominal Gauge: Nominal thickness on the drawing or purchase specification.
  • Lower Gauge Limit: Minimum allowed thickness for this grade and order.
  • Upper Gauge Limit: Maximum allowed thickness for this grade and order.

How to use the result

  • Best suited to coil gauge inspection, supplier thickness review.
  • Two extremes cannot estimate standard deviation, capability or a defect probability. Instrument uncertainty and the inspection sampling plan require separate review.

Current U.S. benchmarks

  • The producer price index for steel mill products stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The producer price index for nonferrous mill shapes (a broad metals benchmark, not aluminum alone) stands at 401.53 (BLS, Oct 2026), up 21.3% from a year earlier. Quotes priced off last quarter's material cost miss this move.
  • The producer price index for primary nonferrous metals (a broad metals benchmark, not copper alone) stands at 589.63 (BLS, Oct 2026), up 42.7% from a year earlier. Quotes priced off last quarter's material cost miss this move. Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026).

Common questions

  • Must the higher reading be entered first? No. The calculation identifies the larger and smaller readings, so swapping their order leaves every result unchanged.
  • Can a small range still fail the specification? Yes. Two close readings can both lie above or below the allowed thickness band. Check both limit margins.
  • Does this calculate process capability? No. Range from two extremes is insufficient for a capability index. Use a suitable measurement study and representative process data.
  • Does passing both extremes certify the whole coil? No. It only compares the entered readings with the limits. Coil acceptance also depends on the sampling plan and measurement uncertainty.

Last reviewed 2026-10-20.