Final Tuning Capacity Calculator

Find how many instruments final tuning can finish in a period after logged downtime and retunes of failed first passes. You need scheduled bench hours, downtime, tune and retune minutes, first-pass yield and instruments due.

What this calculator does

  • Instruments your final tuning benches can finish in a period after downtime and retunes, against the instruments due.

Formula used

  • Uptime = (scheduled bench hours − logged downtime) ÷ scheduled bench hours × 100
  • Bench minutes per instrument = first tune minutes + (1 − first-pass yield ÷ 100) × retune minutes
  • Final tuning capacity = (scheduled hours − downtime) × 60 ÷ bench minutes per instrument
  • Lost to downtime = downtime × 60 ÷ bench minutes per instrument; lost to retunes = (scheduled hours − downtime) × 60 ÷ first tune minutes − capacity
  • Capacity above due = capacity − instruments due; tuning load = instruments due ÷ capacity × 100

Inputs explained

  • Scheduled Tuning Bench Hours: Tuner hours on the schedule this period, summed across benches.
  • Logged Downtime: Scheduled bench hours lost to holds, missing parts or breakdowns.
  • First Tune Time per Instrument: Standard minutes for one final tune and setup, from time study.
  • First-Pass Tuning Yield: Share of instruments passing their first tune, from QC records.
  • Retune Time per Failed Instrument: Average minutes to retune an instrument that failed its first check.
  • Instruments Due From Tuning: Instruments that must finish final tuning this period to ship.

How to use the result

  • Best suited to committing a monthly ship plan, deciding between a second shift and downtime fixes, pricing the capacity cost of first-pass failures.
  • Second retunes on the same instrument are not modeled, so capacity is overstated when they occur. Bench hours are pooled across the room; it does not schedule individual tuners.

Common questions

  • Why does a failed first tune cost capacity if the instrument still ships? Because the retune takes bench time a new instrument could have used. Each failure adds the retune minutes to that instrument's bench time, so capacity falls even though nothing is scrapped.
  • What counts as downtime in a tuning room? Any scheduled bench hour with no tuning possible: humidity holds, waiting for instruments or parts, bench breakdowns and meetings. Log it from the room's records rather than estimating it afterward.
  • Should I time first tunes separately for each model? Yes when the mix changes from period to period. Weight each model's first tune minutes by the number due, so a month heavy in a slow model shows its real load.
  • How is uptime here different from OEE availability? It is the same idea, available time as a share of scheduled time, derived from logged downtime instead of a typed percentage. No performance rate is applied; slow tunes belong in the tune minutes.

Last reviewed 2026-10-28.