Lab Testing Capacity Calculator
Check whether the QC lab can test what the production plan sends it each week. You need analysts, bench hours, minutes per test, the repeat rate and the tests needed.
What this calculator does
- Reportable QC tests the lab can produce each week from analysts, bench hours, minutes per test and repeats, against demand.
Formula used
- Test runs per week = QC analysts × bench hours per analyst × 60 ÷ minutes per test
- Reportable tests per week = test runs per week × (1 − repeat rate ÷ 100), rounded down
- Tests to spare = reportable tests − tests needed per week; capacity used = tests needed ÷ reportable tests × 100
- Analysts needed = tests needed ÷ reportable tests one analyst produces, rounded up
Inputs explained
- QC Analysts: Analysts on the testing roster.
- Bench Hours per Analyst per Week: Hours each analyst spends testing, after meetings and training.
- Minutes per Test: Analyst minutes per test run, including documentation.
- Repeat Rate: Share of runs repeated because they are invalid.
- Tests Needed per Week: Reportable tests the production plan sends each week.
How to use the result
- Best suited to staffing a QC lab for a product launch, checking capacity before a busy month, seeing what fewer repeats are worth.
- Counts analyst time only; instrument availability can limit the lab first.
Current U.S. benchmarks
- U.S. manufacturing runs at 76.1% of capacity with new factory orders at $677B per month (Federal Reserve and Census, Sep 2026).
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
Common questions
- Why do repeats cut capacity? A repeated run takes the same bench time but gives no extra result. At 6% repeats, 224 runs give about 210 reportable tests.
- What are bench hours? The hours an analyst actually spends testing in a week, after meetings, training, maintenance and other work.
- How is analysts needed worked out? Tests needed divided by the reportable tests one analyst produces in a week, rounded up.
- What do the defaults show? 6 analysts with 28 bench hours at 45 minutes a test run 224 tests and report 210 a week, against 200 needed.