Work out what a media fill costs and what a year of them adds up to. You need units per run, media cost per unit, line hours, line cost, incubation and inspection, and runs per year.
What this calculator does
- Cost of an aseptic process simulation run from units filled, media cost, line time and incubation, and of a year's runs.
Formula used
- Media and container cost per run = units filled per run × media and container per unit
- Line cost per run = line hours per run × line cost per hour
- Cost per run = media and container cost + line cost + incubation and inspection per run
- Cost per year = cost per run × runs per year; line time share = line cost ÷ cost per run × 100
Inputs explained
- Units Filled per Run: Units filled with media in one simulation, from the protocol.
- Media and Container per Unit: Growth medium, container and closure per filled unit.
- Line Hours per Run: Hours the line is set up, filling and cleared for the run.
- Line Cost per Hour: Production lost or line operating cost per hour.
- Incubation and Inspection per Run: Incubator time and inspecting every unit, per run.
- Runs per Year: Simulation runs a year for this line, from your program.
How to use the result
- Best suited to budgeting an aseptic qualification program, planning a new filling line's qualification, comparing simulation schedules.
- Leaves out investigations after a failed run and the repeat runs they can require.
Current U.S. benchmarks
- U.S. manufacturing runs at 76.1% of capacity with new factory orders at $677B per month (Federal Reserve and Census, Sep 2026).
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
Common questions
- How many units should a media fill run be? FDA's aseptic guidance gives 5,000 to 10,000 units as a generally acceptable starting point; under 5,000, at least the line's largest batch size.
- How many runs a year? The guidance recommends at least three consecutive successful runs for initial qualification, then semi-annual runs for each processing line.
- How long are filled units incubated? The guidance says incubation should not be less than 14 days, which is why incubation and inspection are costed per run.
- What do the defaults show? 6,000 units at $1.80, 10 line hours at $2,500 and $6,000 of incubation and inspection cost $41,800 a run, $83,600 for 2 runs.