Sterility Test Hold Time Calculator
See how long lots wait on sterility testing and what value sits on hold. You need the test start delay, incubation period, review days, lots tested a week and value per lot.
What this calculator does
- Days each lot waits for sterility test results and the value held while it waits, from test start delay, incubation and review.
Formula used
- Days on hold per lot = test start delay + incubation period + read and review days
- Lots on hold at any time = average lots tested per week ÷ 7 × days on hold (Little's law)
- Value on hold = lots on hold at any time × value per lot
- Incubation share of the hold = incubation period ÷ days on hold × 100
Inputs explained
- Test Start Delay: Days from sampling to the test starting, from lab records.
- Incubation Period: Incubation days your sterility test method specifies.
- Read and Review Days: Days to read the test, review it and release the result.
- Average Lots Tested per Week: Lots sampled for sterility testing each week.
- Value per Lot: Cost of each lot held, from inventory costing.
How to use the result
- Best suited to sizing quarantine storage for sterile product, showing the cash tied up by testing, making the case for faster test starts.
- Does not cover retests or investigations after a positive result.
Current U.S. benchmarks
- U.S. manufacturing runs at 76.1% of capacity with new factory orders at $677B per month (Federal Reserve and Census, Sep 2026).
- Global copper trades at $14,473 per tonne (IMF via FRED, Sep 2026), up 44.8% in a year, and U.S. industrial electricity averages 9.64 cents per kWh. Both feed electrified-hardware unit economics.
Common questions
- Where does the incubation period come from? From your sterility test method; enter the days it specifies. The calculator does not assume a figure.
- How is lots on hold worked out? By Little's law: lots arriving each day times the days each one waits. At these defaults, 6 lots a week waiting 18 days keeps about 15.4 on hold.
- Which days can I shorten? The start delay and the read and review days are yours to cut; the incubation period is set by the method.
- What do the defaults show? 2 days to start, 14 of incubation and 2 to review hold each lot 18 days, keeping about 15.4 lots worth $2,777,142.86 on hold.
Last reviewed 2026-11-12.