Pump, Compressor & Rotating Equipment Assembly calculator

Seal Test Failure Rate Calculator

Check the share of assemblies failing seal testing. Enter matched disposition counts and your quality objective.

What this calculator does

  • Does the observed seal test failure fraction meet the entered quality objective?

Formula used

  • Rate = affected units ÷ tested units × 100
  • Gap = entered target − observed rate
  • Other units = tested units − affected units

Inputs explained

  • Failed Seal Tests: Count each inspected unit once in the selected cohort.
  • Total Tested Units: All units receiving the same test disposition.
  • Maximum Failure Rate: Acceptance objective from your quality plan.

How to use the result

  • Best suited to reviewing acceptance test results, comparing assembly lots.
  • An observed proportion is not a confidence bound or a sampling acceptance plan. Does not measure volumetric leakage or set a permissible physical leak rate.

Current U.S. benchmarks

  • Industrial electricity averages 9.64 cents per kWh across the U.S. (EIA, Aug 2026), up 7.3% from a year earlier. Energy-intensive steps carry this directly into unit cost.
  • Average hourly earnings of production and nonsupervisory workers in U.S. manufacturing are $30.43 (BLS, Oct 2026), up 3.8% from a year earlier. Median machinist pay is $28.24/hr (OEWS 2025), with state medians on each state page. Manufacturers have 584k open positions nationally (BLS JOLTS).
  • Steel mill PPI stands at 399.65 (BLS, Oct 2026), up 32.9% from a year earlier. New factory orders are up 10.5% year over year (Census).
  • The U.S. has 21,668 machinery manufacturing establishments employing about 1,086,146 workers (Census County Business Patterns, 2023).

Common questions

  • Should retests be counted again? No. Use unique units and one consistent disposition rule. For first-pass yield, retain the first test result even after successful rework.
  • What if no units were tested? The rate is undefined. Enter at least one tested unit before interpreting a percentage.
  • Can a small sample prove the target is met? No. The displayed rate describes the entered cohort. Statistical acceptance needs a sampling plan and uncertainty analysis.
  • What does this result measure? It measures the fraction of units failing seal tests. Physical leakage needs a measured volume or mass over time.

Last reviewed 2026-11-17.